You are here

Home » Sound Transit Tacoma Dome Link Extension: Pre-Proposal Meeting

Sound Transit Tacoma Dome Link Extension: Pre-Proposal Meeting

 
Number AE 0030-17
Title Tacoma Dome Link Extension
Bids Due Date/Time 8/07/2017 2:00:00 PM Pacific
Contact Tyler Benson Tel (206) 903-7372 Fax (206) 689-3360 tyler.benson@soundtransit.org
Solicitation Type A&E
Description The Tacoma Dome Link Extension project (Project) will study extending light rail transit from the Federal Way Transit Center in the City of Federal Way to the Tacoma Dome area in the City of Tacoma, a total distance of approximately 9.7 miles. In addition to the extension of light rail, this project will also include an operation and maintenance facility (OMF) in the corridor. The general sequence of work will involve Alternatives Development, followed by an Environmental Impact Statement (EIS), leading to Sound Transit Board selection of the project to be built and Federal Transit Administration (FTA) issuance of a Record of Decision. In addition to advancing the engineering design of the project sufficient to perform the environmental review, design of the preferred alternative may be advanced through preliminary engineering concurrent with preparation of the EIS.
Date: 
Monday, July 17, 2017 - 10:00am to 11:00am
Organizer Name: 
Tyler Benson
Organizer Email: 
tyler.benson@soundtransit.org
Organizer Phone: 
(206) 903-7372