Contact OMWBE:          

You are here

Home » Bainbridge High School 100 Building Replacement – Stage 4 Bidding, Bainbridge Island WA

Bainbridge High School 100 Building Replacement – Stage 4 Bidding, Bainbridge Island WA

Forma Construction

 

Project Name:  Bainbridge High School 100 Building Replacement – Stage 4 Bidding, ALL REMAINING PACKAGES (BP1.0, BP2.0, BP3.0, and BP31.1 have previously bid)

Bid Date & Time:  August 15, 2019 at 2PM PST

Bid Location: BISD Office, 8489 Madison Ave NE, Bainbridge Island, WA 98110

Pre-Bid Walk-Throughs: July 30, 2019 at 10AM and/OR Aug 1, 2019 at 10AM- These are NON-Mandatory but Highly recommended walk-throughs for bidders that have work associated with the existing structure in the 200 building.

 

Assemble at Forma Jobsite Trailer, MLK JR Lane NE, Bainbridge Island WA 98110

Owner:  Bainbridge Island School District

Description:  For the 100 Building: Demolish the existing 100 Building and construct a new 35,250 SF Building, plus 925 SF of separate storage to house the CTE,  Arts and Music Program at Bainbridge High School, as well as the relocated kitchen, servery, and Commons from Building 200.

For the 200 Building: Remodel approximately 13,620 SF of the existing Commons, servery and kitchen to house a classroom, theater, and theater support spaces (dressing room, changing rooms, scene shop, etc) and add a catwalk and tension grid of approximately 2,685 sf at Building 200.

 

GC/CM: FORMA Construction Company, PO Box 11489, Olympia, WA 98508, 360-754-5788, Direct all questions to both: Jared Larson jaredl@formacc.com and Alex Niemi alexn@formacc.com

Notes: Obtain bid documents from BXWA http://www.bxwa.com/bxwa_toc/private/175.html

Closing Date: 
Thursday, August 15, 2019