You are here

Home » Blair Terminal Fender System Upgrades

Blair Terminal Fender System Upgrades

The Work required for this Project includes the removal and disposal of thirteen (13) timber fender piles, demolition and disposal of the timber wale and chock systems, rubber fenders and associated connection hardware. The Work shall include labor, equipment and incidental materials necessary to install Port-Furnished items including: thirteen (13) timber fender piles with Contractor furnished and installed rub facings, Port-Furnished steel wale system, and Port-Furnished stay chains. The contractor shall provide all labor, tools and materials necessary for stay chain installation as shown in the Drawings and described in the Specifications. The Work includes fresh heading two (2) timber fender piles.

 

DETAILS

Closing Date: 
Thursday, November 12, 2020