You are here

Home » COLLEGE PLACE WWTP PHASE 1B

COLLEGE PLACE WWTP PHASE 1B

The Project consists of constructing a new UV disinfection system, two pump stations and buildings, a 50 MG lined lagoon, irrigation pivots, chlorination system, two creek crossings, diesel generators, over 1,000 feet of yard piping ranging in size from 4-inch to 30-inch diameter, controls upgrades and electrical upgrades. 

AIS and Washington Prevailing Wage/Davis Bacon Wage requirements apply. 

PCI is an equal opportunity employer, and highly encourages SBEs and all DBEs (Women-Owned, Minority-Owned, Veteran-Owned, and others) to submit pricing. PCI will attempt to contract with groups of DBEs when a contract is too large for one firm to handle individually.

Bid documents are available at the following link: 

https://prospectconst.sharepoint.com/:f:/s/ClientSharedFolders/IgAMGe_XunbURbE5AuD_blKaAQhfTlCl48sqgJ6R33GUvck?e=B5A4kH

Closing Date: 
Saturday, October 31, 2026
Organization: 
Prospect Construction, Inc.
Point of Contact: 
James Gunther <jgunther@prospectconst.com>