COLLEGE PLACE WWTP PHASE 1B
The Project consists of constructing a new UV disinfection system, two pump stations and buildings, a 50 MG lined lagoon, irrigation pivots, chlorination system, two creek crossings, diesel generators, over 1,000 feet of yard piping ranging in size from 4-inch to 30-inch diameter, controls upgrades and electrical upgrades.
AIS and Washington Prevailing Wage/Davis Bacon Wage requirements apply.
PCI is an equal opportunity employer, and highly encourages SBEs and all DBEs (Women-Owned, Minority-Owned, Veteran-Owned, and others) to submit pricing. PCI will attempt to contract with groups of DBEs when a contract is too large for one firm to handle individually.