I-405 Renton to Bellevue Design-Build Bridge Railing
Project: I-405 Renton to Bellevue Design-Build
Prime: Flatiron-Lane Joint Venture
Scope of Work: Bridge Railing Furnish and/or Install
Flatiron-Lane JV is holding a pre-bid meeting for furnish (fabricate and deliver approximately 1,300 LF of Ornamental Pedestrian type and approximately 450 LF of WSDOT BP/S-BP) and/or install the railing at the anticipated five bridges.
Timeline for Services:
- Design Released for Construction - December 2020 through approximately April 2021
- Installation - Q2 2021 through approximately Q3 2022
RFQ via email - October 16, 2020
Pre-Bid meeting - October 30, 2020
Q&A period ends - November 13, 2020
Unit Price Quotes Due - November 20, 2020
Pre-Register for the pre-bid meeting at: https://www.eventbrite.com/e/i-405-renton-to-bellevue-bridge-railing-pre-bid-meeting-tickets-125046616797
Point of Contact for Questions: Joseph Okelberry, jokelberry@flatironlanejv.com