Lift Station and Force Main Improvements, Phase 1A
WWP-27-3954

Sealed bids will be received until 2:30 p.m. Wednesday, March 6, 2019 at the City Clerk's office, 7th floor and will be opened and publicly read in conference room 511, Wednesday, March 6, 2019 on the 5th floor, Renton City Hall, 1055 South Grady Way, Renton WA 98057.

The work to be performed within 120 working days from the date of commencement under this contract shall include, but not be limited to:

Various mechanical, structural, electrical, and force main improvements on multiple lift stations:

  • The mechanical improvements include the following but not limited to construction of pigging ports, vactor piping installation inside wet wells, and air release valve modifications.
  • The structural improvements include the following but not limited to repairing leaks inside valve vault, existing coating removal, ceiling installation and roof modification.
  • The electrical improvements include the following but not limited to emergency generator installation and its ancillary equipment, modifying existing control panels, and portable generator replacement.
  • The force main improvements include the following but not limited to installation of force main access ports and magnetic markers installation.

The construction will also require temporary pumping during the lift station shutdown for mechanical improvements, landscape restoration, asphalt restoration, and concrete sidewalk restoration.

The City reserves the right to reject any and/or all bids and to waive any and/or all informalities.

Bid documents will be available Monday, February 18, 2019.  Plans, specifications, addenda, and plan holders list for this project are available on-line through Builders Exchange of Washington, Inc., at http://www/bxwa.com.  Click on “bxwa.com”; “Posted Projects”; “Public Works”, “City of Renton”, “Projects Bidding”.  (Note: Bidders are encouraged to “Register as a Bidder,” in order to receive automatic email notification of future addenda and to be placed on the “Bidders List.”  Questions about the project shall be addressed to , Michael Benoit, City of Renton, Wastewater Utility, 1055 Grady Way, Fifth Floor, Renton, WA, 98057, phone (425) 430-7206, fax (425) 430-7241, mbenoit@rentonwa.gov.

The majority of the work around the lift station can be accessed publicly. However, there will be a non-mandatory Pre-Bid Meeting on Tuesday, February 26, 2018 at 9:00 am so that the prospective bidders can observe the work inside the wet wells, valve vaults, and other structures. The pre-bid meeting will provide the opportunity to observe structure and site conditions.  The meeting will start at the Misty Cove Lift Station and will continue to the following lift stations: Stonegate, Pippers Bluff, Shy Creek, Airport, Lind, and East Valley.

A certified check or bid bond in the amount of five percent (5%) of the total of each bid must accompany each bid.

The City's Fair Practices, Non-Discrimination, and Americans with Disability Act Policies shall apply.

 

 

 

Jason A. Seth, CMC, City Clerk

Published:    

                          Daily Journal of Commerce                      February 18, 2019
                          Daily Journal of Commerce                      February 25, 2019

Closing Date: 
Wednesday, March 6, 2019