Lynnwood Link L300 GC/CM Project, Lynnwood WA
Additional project information can be obtained by accessing the link on the attached bid invitation or e-mailing https://app.buildingconnected.com/public/59b1c0096ab4570007e09292. Please reference the project name or number for faster response to inquiries.
SOUND TRANSIT INVITATION FOR BIDS
LYNNWOOD LINK L300
GC/CM PROJECT
IFB NO. RTA/CN 0010-16 BID PACKAGE EW5
CIVIL DEMO
Bids Due: September 20, 2018 at 2 pm
Optional Pre-Bid Meeting:
September 5, 2018 at 1:30 PM
PROJECT DESCRIPTION: The scope of work for this subcontract
opportunity includes engineering, all necessary submittals, drawings
(including as-builts), sawcutting, removals of surface streets, curbs,
sidewalks, driveways, and walls in accordance with the plans and
Contractor’s Schedule. Full notice can be viewed at
www.ebidexchange.com/soundtransit.
LYNNWOOD LINK L300 GC/CM PROJECT
(SB70485)
RUN DATES:
THURSDAY - 08/23/2018
THURSDAY - 08/30/2018
THURSDAY - 09/06/2018
PRODUCTION COST: $228.00 PER DAY
NOTE: Skanska Constructors L300, the GC/CM for this
project intends to bid on this scope of work.