DESCRIPTION OF WORK: The Work is considered in two parts, Schedule A and Schedule B. Schedule A includes all labor, equipment, and materials necessary to recoat the entire interior and exterior of a one-million-gallon steel welded, above ground potable water reservoir 18. Reservoir dimensions are 81 feet diameter and 26 feet height. Reservoir 18 is located at 1925 Cheryl St in Bremerton. Access to the site is through a facility gate located on NE Cheryl Road approximately 300 feet west of the intersection of Forest Dr NE and NE Cheryl St. The Work includes setting up and maintaining scaffolding and an environmental control system, cutting a door panel if needed, rewelding and coating the door panel, abrasive blasting to near white metal (SSPC-SP 10), recoating all interior and exterior surfaces, cleaning and disinfecting the interior in preparation for putting the reservoir back on-line, site cleanup, and proper disposal of all spent materials and coatings all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.
Schedule B includes all labor, equipment, and materials necessary to perform coating replacement on the roof of Reservoir 17 and spot coating repair to the roof of Reservoir 19. Reservoir 17 is a one-million-gallon steel welded, above ground potable water reservoir with dimensions of 95 feet diameter and 18.5 feet height. Reservoir 19 is a two-million-gallon steel welded, above ground potable water reservoir with dimensions of 97 feet diameter and 35.5 feet height.
The City is contracting with Quality Coatings Inspection and Consulting for technical inspection of the work.
Please see the City of Bremerton bid posting for additional information and the Notice Inviting Bids: