Home » RFQ - Architectural and Engineering Services, Federal Way WA

RFQ - Architectural and Engineering Services, Federal Way WA

For full details, visit: http://www.cityoffederalway.com/bids

Highlights from the opportunity include,

The City will follow the following timetable:

  • Issue Request for Statements March 30, 2018
  • Deadline for Submittal of Responses to Request April 20, 2018
  • Selection of Firms to Interview May 2, 2018
  • Interview Firms May 9, 2018
  • Notify Firm Selected May 16, 2018

All Responses to Request for Statements shall be sent to:
Desireé Winkler, P.E.
Deputy Public Works Director / Street Systems Manager
City of Federal Way
33325 8th Ave S
Federal Way, WA 98003-6325
(253) 835- 2711

 

B. Please place three (3) copies of your Statement of Qualifications (“SOQ”) and
performance data in a sealed envelope and clearly label in the lower left corner
“Statement of Qualification for Construction Management and Materials Testing
Services.” No faxed or telephone statements will be accepted.

 

C. All SOQs must be received by 4:00 PM, April 20, 2018 at which time they will be
opened.

The City has need for on-call construction management services for various projects
scheduled for construction in 2018 and 2019 that may vary from full construction
management support to construction inspection only. In addition the City has a need for
on-call construction materials testing firms that are certified to perform these services on
federally-funded transportation projects. The projects we need the above-noted
construction services for include the following:

A. National Highway System (NHS) Preservation Projects: SW Campus Drive (19th
Ave SW to 1st Ave S); and 16th Ave S (S 348th to Pacific Highway S): This
project includes the construction of a full width hot-mix asphalt (HMA)
pavement overlay including: pavement dig-out and repair; concrete sidewalk and
ramp replacement; pavement planing; HMA; striping and pavement markings.
This project is federally funded. Project to be constructed between June 2018 and
October 2018.

B. Military Road and S 298th Street Compact Roundabout: This project includes
construction of a compact roundabout including: curb, gutter, sidewalk, pavement
widening, storm drainage, street lighting, HMA overlay, curbing, signage,
striping and pavement markings. This project is federally funded. Project to be
constructed either in Summer/Fall of 2018 or Spring 2019.

C. Grand Staircase – 21st Ave S – S 316th Ave to S 314th Ave Pedestrian
Connection: This project includes the construction of a “grand staircase” and
integrated ADA accessible ramp to provide a key downtown non-motorized
connection from the City’s new Performing Arts and Event Center to Town
Square Park, Transit Center, and surrounding properties. Project elements
include: cast-in-place concrete retaining walls, stairs, ramps, and sidewalks,
illumination, landscaping, and irrigation. This project is state and locally funded.
Project to be constructed in Spring/Summer 2018.

D. Other construction projects that may need construction inspection and/or
construction materials testing services.

 

Closing Date: 
Friday, April 20, 2018