S. Sherman & Ridgeline Drive Looping (Zone 4) Project, Richland WA
Allstar Construction Group, Inc. is seeking subcontractor/supplier quotes for the “"S. Sherman & Ridgeline Drive Looping (Zone 4)"” project; Contract P1706-19.
Scope of work:
This project includes, but is not limited to, construction of the following: Approximately 2,206 lineal feet of 12-inch diameter ductile iron water main from an existing 12-inch stub, south of the intersection of South Sherman Street and West 33ro Place, to an existing 12-inch stub, east of the intersection of Ridgeline Drive and S. Nelson Street including installation of valves and fittings in an existing roadway right-of-way. Asphalt patching and gravel shoulder restoration work will consist of the removal and disposal of the existing asphalt, top course surface preparation, paving with new asphalt, placing and compacting 5/8-inch minus rock.
Full notice and complete details of the bid are available on Public Purchase City of Kennewick's designated webpage with Public Purchase. Please follow the link below: https://www.go2kennewick.com/300/Bid-Opportunities
Contact Public Purchase directly if unable to access documents online at support@publicpurchase.com. Online Chat is available from 7:00 a.m. to 4:00 p.m. MT at www.publicpurchase.com top left corner. If unable to reach Public Purchase, contact the City of Kennewick Public Works Department at 509-585-4247.
Send subcontractor/supplier quotes to:
Allstar Construction Group, Inc. (bidding as Prime Contractor)
Attn: Bruce Emory, President
2546 Van Giesen St.
Richland, WA 99354
Email: bruce@allstarcgi.com
Fax No. 509-946-8046
Project bids Tuesday February 26, 2019 at 10:00am. Please forward quotes by Monday February 25, 2019 at 4:30pm
For questions, please call 509-943-9825
Allstar Construction Group, Inc. is an EEO Employer. Small, Minority and/or Women Owned firms are encouraged to submit a quote.