US395 NSC Sprague Ave to Spokane River Stage 2
Max J. Kuney Company is bidding as a Prime Contractor on the following Project:
US 395 – NSC Sprague Ave to Spokane River – Stage 2
We are requesting Subcontractor and Supplier pricing on all scopes of work.
Project Details:
Owner: WSDOT
Location: Spokane, Washington
Advertised Project Range: $200-220 Million
Condition of Award Goals: RSBE 5%, VOB 3%
Proposal Due: February 25, 2026 @ 11 AM PST
Subquotes: Scopes due February 20, 2026 @ 5 pm and Pricing due February 24, 2026 by 5 pm
Description of Work: This contract provides for the improvement of US 395/North Spokane Corridor (NSC) by constructing two elevated structures from East Mission Avenue to East Alki Avenue, including prestressed concrete and steel spans, a truss bridge system for the shared-use structure, structure drainage, and associated structure components, a partial interchange at East Trent Avenue with a five-legged roundabout at the NSC ramp termini connecting City of Spokane (COS) streets, continuation of the Children of the Sun Trail shared-use path, utilities including COS water line improvements, hot mix asphalt (HMA) paving, cement concrete paving, illumination, monotube sign bridges, cantilever sign structures, signing, pavement marking, stormwater management, planting, demolition, traffic control and other work. 750 working days.
Scopes of work include but are not limited to:
|
Asphalt Paving |
|
Bridge Bearings |
|
CIP Traffic Barrier |
|
Cast-in-place Concrete |
|
Chain Link Fences & Gates |
|
Demolition |
|
Drilled Shafts |
|
Earthwork/Drainage/Utilities |
|
Electrical & Illumination |
|
Environmental Protection |
|
Expansion Joints |
|
Flatwork |
|
Forming/Lumber Supply |
|
Form Liners |
|
Landscaping |
|
Pavement Marking |
|
PCCP Paving |
|
Permanent Signing |
|
Planing Bituminous Pavement |
|
Precast Girder Trucking |
|
Prestressed Concrete Girders |
|
Reinforcing Steel |
|
Safety/PPE Supply |
|
Sign Bridges |
|
Structural Steel Erection |
|
Structural Steel Fabrication |
|
Structural Steel Girder Trucking |
|
Traffic Barrier |
|
Survey |
|
Temporary Traffic Control |
|
Traffic Barrier |
Project documents can be found at: https://ftp.wsdot.wa.gov/contracts/XE3694-NSC-SpragueAvetoSpokaneRiverStage2/
We encourage any Emerging Small, Rising Small, Veteran Owned, Minority Owned, Women Owned businesses to submit pricing. If you need information on how to get determine if you qualify for any of the Certifications and how to get the Certifications email estimating@maxkuney.com and we can send you information.

