Port of Vancouver Terminal 3 Drainage Upgrades

The Terminal 3 Drainage project modifies the Terminal 3 Stormwater Drainage System to capture more stormwater and send it to treatment. Work includes but is not limited to installation of trench drain with associated concrete work, connecting the installed trench drain to the storm drain system, extruded curb, and one HMA speed bump.

A non-mandatory pre-bid site visit will be held Tuesday, October 1, at 2:00 PM, 3103 NW Lower River Road, Vancouver, WA 98660. Attendees must furnish and utilize safety equipment which includes reflective clothing (or vest), steel toed shoes, gloves, eye protection and a hard hat to enter tenant's leasehold. Those who are not equipped with proper PPE will not be permitted to enter the space.

The engineer's estimate for the paving project is $75,000 - $100,000.

Please go to Port of Vancouver (procureware.com) for additional information and bid documents.

Closing Date: 
Thursday, October 10, 2024