County Road Project, Spokane WA
CLEARWATER CONSTRUCTION & MANAGEMENT LLC
5711 W Garden Springs Spokane, WA 99224
Phone: 509-363-0414 Fax: 509-363-0415
Request for Bids
Project: County Road Project No.3239
Frideger Road Bridge No.4902 Bridge Replacement
County Road Project No. 3245 Frideger Road
Bid Date: November 25th, 2020 11:00AM PST
please send quotes before 3 PM 11/24/20 to allow time for review and DBE paperwork
Location: Spokane County, WA
To Subcontractors and Suppliers,
We would like to formally invite you to bid the above mentioned project. UDBE and DBE Businesses are encouraged to submit bids. If you have any questions or concerns please contact our office by phone or email: korie@clearwaterconstruction.us. Plans and specifications are available for through the Abadan Plan Center, Spokane Regional Plan Center, and Spokane County Plan Center - https://www.spokanecountyplans.com/
Project Description: County Road Project No. 3239: The work provides for the improvements of Frideger Road Bridge No. 4902 located in Section 4, Township 29 N, Range 44 E.W.M., followed by the removal of the existing bridge and the construction of a new structure over Little Spokane River. The new concrete bridge is a single span framed with precast-prestressed girders and is supported by steel pile at each end. Included are; bridge removal, structure excavation, structure surveying, steel piling, cone. CL 4000 for bridge, steel reinf. bar for bridge, superstructure, dust control on detour, beam guardrail, concrete barrier and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specification. County Road Project No. 3245: The work provides for the improvements of Frideger Road Bridge No. 4902 located in Section 4, Township 29 N, Range 44 E.W.M., by removal of the existing roadway and widening with the construction of the new roadway. Project limits extend along Frideger Road with CRP-3245, adjoining CRP-3239 (bridge) at each end, starting 350 feet north of the bridge and ending 1/2 mile south of the bridge. Included are; clearing and grubbing, roadway excavation, embankment compaction, gravel borrow, beam guardrail, HMA, CSBC, dust control maintenance on the detour, and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specification.
Possible subcontracting/supply opportunities for this project include but are not limited to:
Traffic Control |
Concrete Supply |
Aggregates |
Bridge Bearings |
Survey |
Concrete Pumping |
Piles & Shafts |
Guardrail & Bridge Railing |
Demolition & Structure Moving |
Precast-Prestressed Girders |
Landscaping - Hydroseeding |
Signage & Pavement Markings |
Rebar |
Earthwork |
Asphalt |
|