You are here

Home » Deer Path Tank Project

Deer Path Tank Project

Kitsap Public Utility District is seeking sealed bid proposals for the Deer Path Tank Project. Bids are being asked for provision of all necessary labor, equipment, materials, and appurtenances required for demolition of the existing northeast concrete tank and construction of three concrete tanks on one shared foundation. Each tank shall have an inside diameter of 30’, and a height of 34’ to the overflow outlet. The total height of each tank (including railings on roof) must be less than 40’. This project will also include installation of approximately 259’ of 8” DI pipe, tank drainage appurtenances for the new tanks, security fencing, and other work as detailed in the plans and specifications. The invitation to bid, specifications, and contract documents can be found on the KPUD website: https://www.kpud.org/about-us/vendors-bids/.

Closing Date: 
Tuesday, April 16, 2024
Organization: 
Public Utility District No. 1 of Kitsap County (KPUD)
Point of Contact: 
bransom@kpud.org