Flatiron-Lane JV I-405 Virtural Outreach Event
Virtual Outreach Event for I-405 Renton to Bellevue Express Toll Lanes
This $705 million WSDOT design-build project will widen 12 miles of I-405 between Renton and Bellevue. This is a state-funded project with voluntary goals of 10% MBE, 6% WBE, 5% VBE, and 5% SBE.
Please join us for a virtual outreach event on August 27, 2020 at 2:00pm
We strongly encourage any and all MSVWBE firms to attend
Register at: https://www.eventbrite.com/e/flatiron-lane-jv-i-405-virtural-outreach-event-tickets-113364381918
Some of the scopes of work are detailed below:
- Traffic Control
- Electrical
- Foundations (drilling)
- Walls
- Paving
- Fencing
- Sweeping
- Hoisting
- Landscaping
- Pavement Marking
- Curbing
- Erosion Control
- Concrete Flatwork
- Trucking
- Construction Materials/Consumables (safety equipment/lumber)
- Support Services (janitorial, security, bio-hazard, catering, porta-johns, trash hauling)
- Vac Trucks
- Survey
- Pavement Surfacing
- Geotech Monitoring
- Pre-Condition Inspection
- Safety Supply
- Office Supply