2025 WMI-S 308th St/S 320th St-8th Ave S to 11th Ave S and Vicinity (25-1671)
Sealed bids are requested for this work. The proposed work consists of (including all other necessary and appurtenant work) the following: removing and disposing of asbestos-cement and ductile iron pipe water mains; installing 4-inch, 6-inch, 8-inch, 10-inch, and 12-inch diameter ductile iron pipe water main; removing valves and installing gate valves; removing and replacing service lines; removing and replacing hydrants; permitting; construction survey and staking; project temporary traffic control; temporary water service and construction sequencing; temporary water pollution and erosion prevention; utility potholing; removing and replacing road pavement; adjustment of utility cover(s); channelization; restoring the site including property restorations; and other related work. The estimated cost range for this project is $3,500,000.00 to $4,400,000.00.
Please contact the Owner's Purchasing Manager at myoung@lakehaven.org or 253-946-5415 for a copy of the full advertisement or view the advertisement in the Seattle Daily Journal of Commerce on Wednesday, June 25, 2025, and/or Wednesday, July 2, 2025.