23BB1002-Quilcene Fiber Hut Electrical Work
The District is interested in receiving informal quotations for electrical work on the Quilcene Fiber Hut construction project. The general scope of the work to be accomplished is as shown in the enclosed drawings and/or the attached specifications
The Contractor will provide all materials, equipment, and labor as identified below under Project Quotation to complete the project, which consists of installation and wiring of 200A meter base, AC panel, back-up generator, auto-transfer switch, 3-ton BARD unit, DC rectifier plant, interior and exterior outlets, interior, exterior, and emergency lighting and light switch, 9 in. cable ladder system, and 4" wireway. Installation and wiring of all associated circuits from the AC panel and DC plant.
Request for Quotation documents can be found here: https://www.jeffpud.org/projects-studies/