You are here

Home » Aldercrest Campus Field Replacement

Aldercrest Campus Field Replacement

Ohno Construction invites your firm to submit a bid for the following project:

Aldercrest Campus Field Replacement

Shoreline School District No. 412

PROJECT DESCRIPTION:

Work includes but is not limited to converting an existing natural grass field to a synthetic turf surface; Installation and maintenance of temporary erosion and sedimentation controls; Selective Demolition of existing utilities, pavements, and improvements; Earthwork including management of soil moisture content, stripping, excavations fills in support of the construction generally but including utilities, field bases, stormwater detention, and fencing, compaction and density control, and export of soil material in excess of that necessary to complete the work; Storm Drainage Utilities including new storm drains, piping, control structures, detention facilities, and water quality treatment systems; Concrete work including curbs and flatwork; Chain Link Fencing systems; Battery Operated Automatic Irrigation Systems; Complete, vertically draining permeable aggregate field base including field subsurface drainage; Site Furnishings and Equipment including soccer goals and anchors; Coordination and Cooperation with Contractors working on the Owner's behalf on the project site; Maintenance of the work in progress through Final Completion; Final Cleaning; Warranties.

Location: Aldercrest Campus - 2800 NE 200th St, Shoreline, WA 98155

A/E Estimate: $635,000 (No Alternates Identified)

Project Schedule: NTP June 8, 2023; Substantial Completion September 15, 2023; Final Completion September 29, 2023 (80 working days from NTP)

This project is subject to prevailing wages.

Please refer to Shoreline School District’s website for all current COVID-19 Guidelines.

BID DUE DATE & TIME: Monday, March 27 @ end of business day

Proposals may be emailed to estimating@ohnoconstruction.com or faxed to 206-324-8063. Quotes are required at least 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered.

BID DOCUMENTS:

Bid documents are available for download from our website. Please note to manually type in the information. Copy & paste doesn't always work. To access these documents:

https://ohno.sharefile.com/home/shared/fo840041-30e3-41b9-a1e7-54b3011dbdd4

Enter Email: ohnocc.wa@gmail.com

Enter Password: Yosh1966!

Bid documents are provided for your reference only. Ohno makes its best attempt to provide subcontractors with the most complete and current project information for bidding purposes. However, Ohno is not responsible for the accuracy of the supplied bid documents. All takeoff quantities provided by Ohno are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote. Please contact the Estimating Department for any questions.

STANDARD REQUIREMENTS:

By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. Any and all bids may be rejected at the sole discretion of Ohno Construction. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2 percent. The surety must be a Washington admitted surety. Insurance must name Ohno, the project Owner and any other parties so designated as additionally insured and be in the types and amounts required by the specifications. Please contact our office if you need assistance.

Closing Date: 
Tuesday, March 28, 2023
Organization: 
Ohno Construction
Point of Contact: 
estimating@ohnoconstruction.com