You are here

Home » Allen Library iSchool Retrofit UW Project# 206472 – GLY Project# 9525 Introduction:

Allen Library iSchool Retrofit UW Project# 206472 – GLY Project# 9525 Introduction:

Introduction:
GLY would like to formally request interested parties to submit pricing for the buildout of the UW’s new
offsite book storage at their Sand Point facility. Scopes we are currently looking to have priced include
Division 02 – Demolition, Division 06 – Casework, Division 08 – Doors, Frames, & Hardware, Division 09 –
Framing & Drywall, Division 09 – Acoustical Ceiling Tile, Division 09 – Flooring, Division 09 – Painting, and
Division 10 – Toilet Partitions

Overview:
Project scope includes renovation of approx. 15,000 SF in Allen Library 1st Floor for temporary use by the
UW iSchool program. Renovation includes construction of new offices and finish upgrades to the existing
space.

Attachments:
· 22-0211 Allen Library Design Set
· Good Faith Survey dated 5/7/21. Note that only locations for Allen Library apply.
Link to Attachments: https://gly.filegenius.com/downloadPublic/kexif772e3w99w6

Additional Items for Consideration:
· All proposals to be received by GLY no later than 4/8/22 delivered via email to
brad.jannusch@gly.com & ryan.thompson@gly.com
· State any certifications with Washington State OMWBE.
· Rough Timeline Construction for Allen Library – January 2023 through May 2023.
· This is a prevailing wage project.

If you have any questions or clarifications needed during proposal development please reach out to
Brad Jannusch – E: brad.jannusch@gly.com or Ryan Thompson – ryan.thompson@gly.com

Closing Date: 
Friday, April 8, 2022
Organization: 
GLY Construction
Point of Contact: 
Brad.Jannusch@gly.com