Bid - T100 Tacoma Link Extension, Tacoma WA
Walsh Construction Company II, LLC, as a prime contractor, is requesting bids from subcontractors and suppliers, including certified DBE and SBE firms, for the following:
T100 Tacoma Link Extension
Sound Transit
Bid Date: 10 a.m. PDT, May 23, 2018
Subcontractor and supplier bids requested 24 hours prior to bid date
Project Introduction
This project includes constructing 2.4 miles of light rail transit (LRT) service, six new stations and one relocated station, and four traction power substation (TPSS) sites. It also includes expanding the existing Operations and Maintenance Facility (OMF) and demolishing an existing warehouse at the OMF site. Two-way train tracks will be in existing road lanes shared with cars and buses, and will be compatible with on-site parking and existing bicycle facilities.
Work Scopes
The work includes demolition, contaminated soils removal and disposal, minor asbestos abatement, piling, building civil, structural, mechanical and electrical work, new rail yard, modifications to existing maintenance facility, procurement of pre-fabricated paint booth and vehicle wash, at grade center platform stations, architectural finishes, mechanical, electrical and lighting systems, traffic signals, traction power, overhead catenary system, special track work, new water main, sanitary and storm sewer relocation, temporary utility outages, storm water management, street grading and paving, modifications to curb ramps, driveways and sidewalks, new retaining walls, traffic control, and systems installation and commissioning.
Major subcontracting opportunities include:
Sawcutting Landscaping QA/QC Program
Sidewalk Curb/Gutter/Ramps Driveways
Yard SD and SS Yard Waterline Yard Systems
Storm Drainage and Sewer Water Lines Jack and Bore Utilities
System Ductbank Installation Survey Concrete Paving
Colored/Stamped Concrete Asphalt Paving Maintenance of Traffic
Temporary Erosion Control OMF Demolition OMF Structural Steel
OMF Doors and Hardware OMF Drywall OMF Painting
OMF Ceiling OMF Ceramic Tile OMF Relites
OMF Glass/Glazing OMF Skylights OMF Fire Suppression
OMF HVAC System OMF Plumbing System OMF Electrical
OMF Pile Driving OCS Pole Foundations Traffic Signals
Station Concrete Station Electrical Station Lighting
OCS/TPSS/Communications
DBE/SBE Goals and Requirements
The project has an SBE goal of 8% and DBE goal of 4%. Walsh intends to negotiate with all certified SBE and DBE firms to encourage project participation, including consideration of quotes for any item of work, portion of an item, or combination thereof.
Bonding and Insurance
Performance and payment bonds with a surety company, subject to the approval of Walsh, are required of subcontractors with subcontracts for $250,000 or more. We will reimburse bond premiums up to 2%. For questions/assistance regarding bonding, insurance, credit, equipment, supplies, materials or related services, please call our office at 206.392.7300. Your bonding rate must accompany your bid.
Plans and Specifications
Plans can be viewed on the Sound Transit website at: https://www.ebidexchange.com/soundtransit
or at our Seattle office located at: 16400 Southcenter Parkway, Suite 501, Seattle, WA 98188
To schedule an appointment to view plans, please call (206) 394-7300.
Submitting a Bid
Please fax your bid to (206) 394-7398 or email Mark Michalak / mmichalak@walshgroup.com.
Not Bidding?
If you are choosing not to submit a bid for work, we would greatly appreciate you letting us know by emailing us at bid.wpcivil@walshgroup.com. If we do not hear from you within 10 days, we will follow up by phone, mail or email to see if additional information or assistance is needed.
We look forward to hearing from you.
Sincerely,
Walsh Construction Company II
WALSH CONSTRUCTION COMPANY II, LLC, Is An Equal Opportunity Employer, Disability/Veteran