Boundary County Airport - Slope Stabilization Project
S&L is requesting sub bids and material quotes from all qualified subcontractors and suppliers including MBE, WBE, SBE and DBE for the following:
Boundary County Airport - Slope Stabilization Project
Bid date: April 3, 2023
Bid time: 2:00 pm
Plans are available at: to-engineersplanroom.com
Project description:
Work generally consists of the stabilization of a slope failure. Work includes survey, clearing,
grubbing, excavation, embankment, geotextile fabric, drain rock, drain pipe, erosion control, well
abandonment, fencing, topsoiling, seeding, and other miscellaneous items.
Areas of work: Surveying, grubbing, geotextile fabric, drain pipe, fencing, topsoil, seeding and other misc. items.
Please verify your intent to provide a quotation to admin@slunder.com and repsond by March 31, 2023 with your proposals.
Thank you for your time and consideration.