You are here

Home » BTC Campus Center Seismic Retrofit - BP 03.1, 06.1, 08.1, 10.1 & 21.1

BTC Campus Center Seismic Retrofit - BP 03.1, 06.1, 08.1, 10.1 & 21.1

SUB-BIDS REQUESTED

BELLINGHAM TECHNICAL COLLEGE – CAMPUS CENTER SEISMIC RETROFIT

BID PACKAGES Bellingham, WA

BID DATE:  August 26th, 2024 at 3:00PM

BID PACKAGE NO. 03.1 - CONCRETE

BID PACKAGE NO. 06.1 – FINISHES*

BID PACKAGE NO. 08.1 – STOREFRONTS

BID PACKAGE NO. 10.1 – OPERABLE PARTITIONS

BID PACKAGE NO. 21.1 – FIRE SUPPRESSION SYSTEMS

-----------------------------------------------------------------------------------------

Dawson Construction is requesting subcontractor bids for the bid packages referenced above for the Bellingham Technical College – Campus Center Seismic Retrofit project.

                                                                      Bid Package           Budget                       Pre-Bid Date/Time                          Pre-Bid Details

                                                                      03.1                         $500,000            August 5th & August 12th at 10AM          Mandatory, On Site

                                                                      06.1*                       $530,000            August 5th & August 12th at 11AM           Mandatory, On Site

                                                                      08.1                        $200,000             August 5th & August 12th at 2PM            Mandatory, On Site

                                                                      10.1                        $242,000             August 5th & August 12th at 1PM            Mandatory, On Site

                                                                      21.1                         $28,000            August 5th & August 12th at 1:30PM         Mandatory, On Site

*indicates a package the GCCM, Dawson Construction, LLC, intends to bid

Sealed bids are due no later than the dates/times indicated above and must be received at Dawson Construction Office, located at 405 32nd St. Suite 110, Bellingham, WA. Bids will be publicly opened following submission deadline. Bids received after this time and date will be returned unopened and will not be considered. Faxed or emailed bids will not be accepted. A bid bond will be required in the amount of (5) percent of the bid amount, for any bids in excess of $35,000.

Dawson Construction and Bellingham Technical College shall have the right to accept the lowest responsive bid from a statutorily “responsible” bidder, provided the bid has been submitted in accordance with the requirements of the Bidding Documents. The GCCM and the Owner shall have the right to waive informalities on a bid or bids and shall have the right to reject any and all bids for the project. See Contract Documents for complete information on what must be submitted.

For access to plan sets, bid documents and pre-bid meeting links please email bids@dawson.com

405 32nd Street, Suite 110, Bellingham, WA 98225

(360) 756.1000, Email: bids@dawson.com

Dawson is an equal opportunity & affirmative action employer. We request bids from ALL subcontractors & suppliers including: Small Businesses, Women-owned, Disadvantaged, Minority, Veteran

and Disabled Veteran businesses. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin.

We are a member of the AGC of Washington.

                                           #DAWSOCL848CS                               (SB70950)

Closing Date: 
Monday, August 26, 2024
Organization: 
Dawson Construction
Point of Contact: 
bids@dawson.com