Bus Stop Pad Construction and Improvements Project, Olympia WA
NOTICE TO BIDDERS
REQUEST FOR BIDS (RFB)
BUS STOP PAD CONSTRUCTION AND IMPROVEMENTS
PROJECT #2003C
Intercity Transit, the public transportation provider in Thurston County, Washington, is requesting bids for the Bus Stop Pad Construction and Improvements Project #2003C. This Contract provides for the construction of fourteen (14) bus stop pads located at various sites throughout the City of Lacey and Thurston County. The project consists of, but is not limited to, excavation and removal items, installation of curb and gutter, sidewalk, concrete bus stop pads, traffic control, erosion control measures, construction survey, and all other work described in the Plans and Specifications.
The Engineer’s Estimate is $60,000 to $80,000. This project does not have Federal funding.
Contract documents and planholder’s list are available through Builders Exchange of Washington, Inc. at http://www.bxwa.com.
Submittal Time/Date/Location: Sealed bids are due prior to 11:00 a.m., (PST) on July 30, 2020. Enclose the Bid Submittal in a sealed envelope or container labeled as follows:
- Mail in and received prior to 11:00 a.m. July 30, 2020:
Intercity Transit
Attn: Tammy Ferris
526 Pattison Street, SE
Olympia, WA 98501
BID – DO NOT OPEN
Bus Stop Pad Construction and Improvements–Project #2003C
- Hand-deliver only between the hours of 9:00 a.m. and prior to 11:00 a.m., July 30, 2020:
Intercity Transit
Attn: Tammy Ferris
526 Pattison Street, SE
Olympia, WA 98501
BID – DO NOT OPEN
Bus Stop Pad Construction and Improvements–Project #2003C
The sealed bids will be publicly opened and read at 11:00 a.m., on July 30, 2020, outside and under the covered canopy of Intercity Transit’s Administration Building to allow for safe social distancing.
Please contact Tammy Ferris, Procurement Coordinator, by phone at (360) 705-5818 or email at tferris@intercitytransit.com with any questions regarding this solicitation.