You are here

Home » Cedar River Trestle Bridge Repairs, Renton WA

Cedar River Trestle Bridge Repairs, Renton WA

SECTION 00 11 13

ADVERTISEMENT FOR BIDS

 

The City of Renton invites interested and qualified contractors to submit sealed bids for the following project:

 

TITLE:                                                                    Cedar River Trestle Bridge Repairs

 

ENGINEER’S COST ESTIMATE:                               $441,000.00, including WSST.

 

SUBMITTAL TIME/DATE/LOCATION:                    Prior to 3:00 P.M., January 28, 2020 at the

                                                                                                        Office of the City Clerk, Seventh Floor

                                                                                                        Renton City Hall

                                                                                                        1055 Grady Way, Renton, WA  98057

 

                                                                              Public Bid Opening will commence at approximately 3:10 P.M. in Room 621,

                                                                                    Sixth Floor, Renton City Hall,
1055 South Grady Way, Renton, WA 98057.

 

PRE-BID CONFERENCE/SITE WALK-THROUGH:    10:30 A.M. January 14, 2020 at

                                                                                    Cedar River Trail Bridge Parking Lot, 3225 SE 7th St, Renton, WA 98058.

 

                                                                                                        Attendance at the pre-bid conference/site walk-through is highly encouraged but is not mandatory.

 

The work, to be substantially completed by August 31, 2020 under this contract shall include, but is not be limited to: repair of Cedar River Trestle Bridge and related site work.  The proposed repairs will rebuild the abutment within its current footprint by repairing timber piles, repairing/replacing timber facing, and replacing lost material behind the facing.  Repairs will be made to existing serviceable facilities and be conducted within the existing footprint of the facilities, with minimal environmental impacts.

Details

 

Closing Date: 
Tuesday, January 28, 2020