You are here

Home » City of Ritzville - Well 8R Pump Station

City of Ritzville - Well 8R Pump Station

The City of Ritzville (Owner) is requesting Bids for the construction of the Well 8R Pump Station Project. Bids for construction of the Project will be received by the Owner via online submission only, until 3:00 (PM), Thursday, November 2, 2023 local time. Bids will be opened and read aloud virtually via the following link:

meet.google.com/dbz-zxwz-csi

Phone Numbers

(‪US)‪+1 651-395-7420

PIN: ‪962 261 256#

The Project includes construction of the Well 8R Pump Station. Major elements of work generally include:

  • 22’x28’ wood frame building with metal roof and siding with a 12’x11’ removable section
  • 700 HP open line shaft water lubricated vertical turbine well pump with 2,000 gpm capacity
  • Site work, site piping and pump station piping
  • Electrical, soft starter and related controls
  • Pumping system startup and testing
  • Other related items

Obtaining the Bidding Documents

The BIDDING DOCUMENTS may be examined at the Issuing Office:

1.              Varela Engineering & Management, 601 W. Mallon Ave., Suite A, Spokane, WA 99201

2.            Visit www.varelaplanroom.com under “Public Jobs”. Prospective bidders may view digital files at no cost.

To Bid the project, Bidder shall download a full set of the BIDDING DOCUMENTS from www.varelaplanroom.com under “Public Jobs” and shall be on the Plan Holders List. Bids shall be submitted electronically via the Varela Plan Room website and in accordance with the Instructions to Bidders. Additional bid acceptance and contract award provisions are specified in the Contract Documents.

For additional information regarding this project, contact Ben Varela at Varela Engineering & Management at (509) 328-6066 or bvarela@varela-engr.com

Instructions to Bidders

For other requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders and other documents that are included in the Bidding Documents.

American Iron and Steel

Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term “iron and steel products” means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials.

 

The following waivers apply to this Contract:

De Minimis,

Minor Components,

Pig iron and direct reduced iron

This Advertisement is issued by:

Owner:  City of Ritzville

By:          Linda Kadlec

Title:       Mayor

Date:      10/18/23

Closing Date: 
Thursday, November 2, 2023
Organization: 
Varela Engineering
Point of Contact: 
tturner@varela-engr.com