Project description: 

This project consists of the construction of approximately 215 feet of 48” steel casing pipe installed by trenchless methods, 3,275 feet of 30” ductile iron water pipe, 44 feet of 12” ductile iron water pipe, 54 feet of 8” ductile iron water pipe, 562 square yards of 6-inch thick HMA pavement patching, ,172 square yards of 5-inch thick HMA pavement patching,55 square yards of 2-inch thick HMA pavement patching, 399 linear feet of curb and gutter, 231 square yards of concrete sidewalk, sundry utility adjustments, and other related miscellaneous items.

Areas of work: Gravel, fencing, survey, piping and appurtenances, traffic control, curb and gutter, concrete and asphalt.

Please verify your intent to provide a quotation to admin@slunder.com and repond by 2/24/23 with your proposals.

Thank you for your time and consideration.

 

 

Closing Date: 
Monday, February 27, 2023
Organization: 
S&L Underground
Point of Contact: 
admin@slunder.com