City of Tekoa Influent Lift Station Replacement Project
Abandonment of the 10-inch influent line and the existing lift station, and replacement of the existing lift station with a new CMU enclosed lift station building. The project will also include approx. 70 LF of 8-inch SDR 35 PVC gravity drain, 25 LF of 6-inch DI Class 52 force main, piping, connection tie-ins to the existing infrastructure on the plant site, site electrical upgrades, and associated work.