Drilling Wells 7 and 8
The work consists of furnishing all labor, materials, and equipment necessary for construction of the Drilling of Wells 7 and 8. Work shall include, but not be limited to, the following: File a Start Card with the Department of Ecology; Implement erosion control, environmental protections, develop and implement an SPCC plan, take preconstruction and postconstruction site photos, and perform site preparation needed to perform the work; Drill, develop, inspect, test, and disinfect two potable water supply wells, approximately 155 feet deep with stainless steel screens, sand filter pack, and extended surface seals; Manage and dispose of all waste products (including pump test water) and complete site restoration; File all required construction documentation with the Department of Ecology.