You are here

Home » E. Camano Dr. & McElroy Dr. Roundabout

E. Camano Dr. & McElroy Dr. Roundabout

Project Description
The work to be performed by the CONSULTANT consists of collection and analysis of geotechnical data, completion of a topographic and right of way survey, environmental permitting, right of way appraisal and negotiation, drainage report and analysis of stormwater quality requirements, design and construction support of a three-leg roundabout for improvements to N East Camano Drive and McElroy Drive, located on Camano Island in Island County, Washington.

This project phase one includes the west exit driveway at 370 N East Camano Drive. The general scope of work includes This project has a twelve percent (12%) DBE goal. The major features of the project are as follows:

  • Design of a new three-leg Roundabout at the intersection of N East Camano Drive and McElroy Drive and the exit of Camano Plaza onto N. East Camano Drive.
  • Preparation of a Drainage Report and analysis of Stormwater Quality Requirements.
  • Meet the requirements of the Washington State Department of Ecology (DOE) as it relates to Storm Quality.
  • Prepare a Drainage Report Justifying Design Choices.
    • Preparation of a Geotechnical Engineering Report:
      • Subsurface soils investigation.
      • Engineering Analysis and Recommendations.
    • Preparation of a Full Topographic Survey and Existing Conditions for Plan Development:
      • Right-of-way (ROW) survey, existing and proposed.
      • Legal Descriptions and Exhibit Maps for New Right-of-Way Acquisitions and Temporary Construction Easements.
  • Preparation of a Right of Way Plan.
  • Property Appraisal and negotiation for new Right of Way and Temporary Construction Easements.
  • All environmental work and reporting necessary to meet permitting requirements set by Island County Planning, WDFW, WDOE, NEPA, and the US Army Corps of Engineers, including assessment, mitigation, and monitoring.
  • Coordination regarding all utility related issues, if any.
  • Develop roundabout project concepts to facilitate public input, and coordinate with the public, stakeholders, and Island County for Public Meetings.
  • Development of full plan sets, stamped by an Engineer, meeting the requirements of Island County, LAG manual, and applicable state and federal regulations
  • Development of project specific special provisions in the format of WSDOT’s standard specifications, and meeting the requirements of Island County, LAG Manual, and applicable state and federal regulations.
Closing Date: 
Tuesday, August 20, 2024
Organization: 
Island County Public Works
Point of Contact: 
Sheila Daut - s.daut@islandcountywa.gov