Everett Port Gardner Storage Facility
Prospect Construction is bidding the City of Everett Port Gardner Storage Facility as a prime contractor and would like to invite DBE, MBE, WBE companies to bid on this project. Please submit bids to mmccarthy@prospectconst.com by end of day 6/30 or at latest early morning 7/1.
Project Description:
This project serves to improve water quality in the Possession Sound and Port Gardner Bay byu reducing combined sewer overflows and providing regional stormwater treatment for more than 200 acres of urban watershed. Phase 1 of the program includes the design of the Port Gardner Storage Facility (PGSF). The City of Everett acquired the Kimberly-Clark Wastewater Treatmewnt Plant in 2019 to repurpose the infrastructre into the PGSF. The PGSF will provide temporary combined sewer storage, reducing CSO's at the City's four remaining uncontrollled CSO discharge points to meet the Washington State Department of Ecology executed agreed order number 11638. This facility will also provide stormwater treatment for separated stormwater drainage basins with conveyance to the City's deppwater outfall and local stormwater conveyance to the Everett Water Pollution Control Facility. Construction of the PGSF involves retrofit of the project site through installation pf combined sewer and stormwater infrastructure. this includes, but is not limited to, buried conveyance pipelines, construction of two green field pump stations, rehabilitation of the existing aeration basins and secondary clarifiers, installation of a ground stabilizing buttress wall, pre-cast and cast in place vaults, architectgural improvement made to existing buildings, installation of electrical systems, instrumentation and controls, and pile supports for new and existing structures. This work also involves all facility commissioning and start up activities.
Bids needed:
- Demolition
- Rebar Supply and Install
- Waterproofing
- Thermal Insulation
- Metal Roof Panels and Wall Panels
- Overhead Coiling and Sectional Doors
- Drywall, Framing, Cement Plastering
- Acoustical Ceilings
- Resilient Tile Flooring
- Resinous Flooring
- Painting/Coating
- Solid Surfacing Countertops
- Settlement anbd Vibration Monitoring
- Soil Cement Ground Improvement
- Mitigation Measures for Settlement Control
- Excavation Support Systems
- Concrete Filled Steel Piles
- Drilled Micropiles
- Asphalt Paving
- Chain Link Fences and Gates
- TV Inspection
- Pipe/Mechanical Insulation
- Bridge Cranes
- Plumbing
- HVAC
- Electrical
Please contact mmccarthy@prospectconst.com for questions and to turn in a bid.
Link to the project documents: