You are here

Home » Garfield Superblock Renovation

Garfield Superblock Renovation

Ohno Construction invites your firm to submit a bid for the following project:

Garfield Superblock Renovation

City of Seattle

PROJECT DESCRIPTION:

Renovation of elements in the area surroundings Garfield Playfields in alignment with the community-driven site plan and vision for the site. Improvements include an accessible .34 mile loop path (promenade) around the playfields (including earthwork and footings for artwork), tree protection, playfield turf replacement, demolition of existing restroom building and site features, a new restroom building, play area, a multi-use sport court for tennis and basketball, nature play area and climate adaptive garden. Scope also includes removal, protection, and reinstallation of existing on-site memorial boulder.

A/E Estimate: Base Estimate: $6,434,174.00

Additive #1 (A/E $341,447.00) is for an all-ages parkour facility; Additive #2 (A/E $77,009.00) is for various site furnishings; and Additive #3 (A/E $161,805.00) is for a picnic shelter.

Location: 537 25th Avenue, Seattle, WA 98122

Project Duration: Substantially Complete within 260 working days of the Notice to Proceed; Physically Complete within 270 working days of the Notice to Proceed.

Labor/Wage: Subject to the City of Seattle’s Community Workforce Agreement (CWA) and Priority Hire SMC 20.37

https://www.seattle.gov/documents/departments/fas/purchasingandcontracting/labor/seattle_cwa_final.pdf

Apprenticeship Utilization: All Subcontractors must participate

WMBE/City of Seattle Inclusion Plan: 28% WMBE Utilization Ratio (Park Development)

BID DUE DATE & TIME: Tuesday, May 20 @ 2pm*

Proposals may be emailed to estimating@ohnoconstruction.com or faxed to 206-324-8063. Quotes are required at least 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered.

*Note Bid date is Wednesday, May 21st @ 2:00PM. We would like to request bids a day early to ensure time for questions and data entry.

BID DOCUMENTS:

Bid documents are available for download from our website. Please note to manually type in the information. Copy & paste doesn't always work. To access these documents:

https://ohno.sharefile.com/home/shared/fof9b81e-78e6-49ee-af86-d1504875f6de

Enter Email: ohnocc.wa@gmail.com

Enter Password: Yosh1966!

Bid documents are provided for your reference only. Ohno makes its best attempt to provide subcontractors with the most complete and current project information for bidding purposes. However, Ohno is not responsible for the accuracy of the supplied bid documents. All takeoff quantities provided by Ohno are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote. Please contact the Estimating Department for any questions.

STANDARD REQUIREMENTS:

By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. Any and all bids may be rejected at the sole discretion of Ohno Construction. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2 percent. The surety must be a Washington admitted surety. Insurance must name Ohno, the project Owner and any other parties so designated as additionally insured and be in the types and amounts required by the specifications. Please contact our office if you need assistance.

BID RESPONSE:

Please return your Bid Response to the Estimating Department by email at estimating@ohnoconstruction.com or by fax to 206-324-8063. Ohno Construction Company is an equal opportunity employer and encourages minority, women, veteran, small, and disadvantaged businesses to submit proposals.

Our firm will be providing a bid for this project: YES NO IF NO, WHY:

CONTACT: PHONE:

COMPANY: WA LICENSE #:

SCOPE COVERED: EMAIL/FAX:

 

Closing Date: 
Wednesday, May 21, 2025
Organization: 
Ohno Construction
Point of Contact: 
estimating@ohnoconstruction.com