INVITATION TO BID

 

HIGHLINE HIGH SCHOOL BID PACKAGES

 

BP #02150 – Site Landscaping

BP #04010A – Masonry Restoration

BP #07030 – Metal Panel Siding and Roofing

BP #08010 – Doors, Frames and Hardware

BP #08100 – Windows, Aluminum Storefront & Curtainwall

BP #09010 – Framing and Drywall

BP #09040 – Acoustic Ceilings

BP #09060 –Ceramic Tile

BP #09080 – Wood Flooring

BP #09120A – Resilient and Athletic Flooring

BP #09120B – Carpet Flooring

BP #09140 – Painting and Wall Coverings

BP #10010 – Rough Carpentry and Misc. Specialties

BP #11020 – Theater and Stage Equipment

BP #12010 – Casework and Millwork

BP # 12040 – Theater Seating

BP #14010 – Elevators

BP # 22000 – Mechanical

 

Highline Public Schools

 

Sealed bids will be received by Highline Public Schools and Skanska U.S.A. Building, Inc. for construction subcontracts to the GC/CM contract between Skanska U.S.A. Building, Inc. and Highline Public Schools for the above listed Scopes of Work. 

 

BID PACKAGES DUE DATES

 

                The following bids are due at 9:00am on May 22, 2019:

                BP #07030 – Metal Panel Siding and Roofing

                BP #08100 – Windows, Aluminum Storefront & Curtainwall

BP #22000 – Mechanical

BP #02150 – Site Landscaping
                BP #04010A – Masonry Restoration

 

The following bids are due at 1:00pm on May 22, 2019:

                BP #08010 – Doors, Frames and Hardware

BP #09010 – Framing and Drywall

BP #09040 – Acoustic Ceilings

                BP #12010 – Casework and Millwork

                BP #14010 – Elevators

                 

The following bids are due at 9:00am on May 23, 2019:

                BP #09060 – Ceramic Tile

                BP #09080 – Wood Flooring

                BP #09120A– Resilient and Athletic Flooring

                BP #09120B – Carpet Flooring

 

The following bids are due at 1:00pm on May 23, 2019:

BP #09140 – Painting and Wall Coverings

BP #10010 – Rough Carpentry and Misc. Specialties

BP #11020 – Theater and Stage Equipment

BP #12040 – Theater Seating

 

Deliver sealed bids to:

 

Highline Public Schools Facilities Campus

Building A

17810 8th Ave S

Burien, WA 98148                                                            

Attn: Superintendent, Highline Public Schools

                                                                                               

Bids will then be publicly opened and read aloud five minutes after the bid due time. Bids received after the dates and times stated above or faxed bids WILL NOT receive consideration.

 

PRE-BID CONFERENCE

Non-mandatory, though highly encouraged pre-bid conferences will be held at the following location for all Group 2 Bid Packages. Pre-Bid Conference will start at 4:00pm on April 19, 2019.

Location: Highline High School, Building 600 Cafeteria, 225 S. 152nd Street, Burien, WA 98148

 

Contract Documents for this work may be obtained online at Builder’s Exchange of Washington (www.bxwa.com) under Posted Projects/General Contractor Project areas/Washington/Skanska/Projects Bidding. They will be available on April 15th, 2019.

 

Questions that develop during the bid period must be submitted via email to Skanska USA Building, Inc. to margot.vanswearingen@skanska.com. All questions and answers will be published via addenda during the bid period. Questions must be received no later than 12:00 PM on May 8th, 2019.  DO NOT present questions directly to the Architect/Engineer. 

 

A bid guarantee of 5% of the total bid amount is required at the time of bid.  Bid deposits may be submitted in the form of a Bid Bond or cashier’s check, made to Skanska U.S.A. Building, Inc.

 

BUSINESS EQUITY: The project is committed to providing the maximum practicable opportunity for participation in contracting by disadvantaged business enterprises.  That commitment includes maximizing opportunity for federal-certified Disadvantaged Business Enterprises (DBEs). Participation may be either on a direct basis or as a subcontractor or supplier.  No minimum level of DBE participation shall be required as a condition of being deemed responsive and responsible.  

 

RETENTION: Skanska plans to obtain a Retention Bond for the project.  Subcontractors will have the option of providing Skanska a retention bond in lieu of having retention held.  Those who do not, option to provide a bond will be held to the standard 5% retention.

 

Skanska USA Building, Inc. reserves the right to reject any or all bids and to waive any non-material informalities or irregularities in the bids received.  A bidder may withdraw its proposal by submitting a written request before the bid opening time.  Skanska will return the proposal unopened after contract award.

 

Closing Date: 
Thursday, May 23, 2019