You are here

Home » I-405 Renton to Bellevue Widening and Express Toll Lanes Project (Design-Build)

I-405 Renton to Bellevue Widening and Express Toll Lanes Project (Design-Build)

Flatiron – Lane, a Joint Venture

Invitation to Bid - Request for Subcontractors and Suppliers

Minority, Small, Veteran and Women’s Business Enterprise (MSVWBE) Participation Encouraged

Project:  I-405 Renton to Bellevue Widening and Express Toll Lanes Project (Design-Build), Contract No. 9242

Owner:  Washington State Department of Transportation (WSDOT)

Scope and Preliminary Pricing must be received no later than July 16, 2019, by 5:00 p.m.

Quotes due from Subcontractors and Suppliers – July 23, 2019, by 5:00 p.m.

Quotes requested for, but not limited to: Aggregates & Trucking, Architectural Form Liners, Barrier & Guardrail, Bridge Bearings, Bridge Drains, Bridge Joint Assemblies, Bridge Joint Rehabilitation, Clearing & Grubbing, Column Casings, Concrete Pumping, Crane Rental, Demolition, Directional Boring, Drilled Shafts, Driven Pile, Environmental Protection, EPS Blocks, Erect Structural Steel, F&I Rebar, Fencing, Flatwork Concrete, Geosynthetic Walls, Girder & Assembly Transport, Gravity Block Walls, Grind/Groove Deck & Approach, Jack & Bore, Landscaping, Lightweight Cellular Concrete, Milling & HMA Paving, MOT Barriers, MSE Walls, Noise Barrier Walls, OH Sign Structures, Ornamental Bridge Railing, Pavement Markings, PCC Paving, Pigment Sealer, Pipe Pile, Precast Concrete Barrier, Precast Concrete Girders, Precast Coping, Precast Deck Panels, Precast Utility Vaults, Ready-Mix Concrete, Roadway Signage, Seismic Retrofit, Sheet Pile, Slip Form Traffic Barrier, Soil Nails/Shotcrete, Soldier Pile/Tieback, Steel Girder & Framing, Timber Lagging, Trail Furnishings, Underground Pipe, Utilities, Waterproofing and Welding & Shear Studs.

Plans and specifications can be downloaded, at no cost from WSDOT website at https://www.wsdot.wa.gov/biz/contaa/Contracts/Renton.html.  Access to the documents in electronic format is also available from Flatiron. Additionally, the documents are available to view at Flatiron’s Renton, WA office.  Please send an email to WABids@flatironcorp.com to request access or to make an appointment to view the documents.

Quotations must be valid for same duration as specified by Owner for contract award (120 days).

Bond Requirements: Notwithstanding any contrary language in a bid to Flatiron – Lane, a Joint Venture (FLJV) or any prior course of dealing between FLJV and a bidder, and unless waived in writing by FLJV, FLJV reserves the right to require each bidder to provide payment and performance bonds assuring bidder’s obligations to FLJV in the amount of 100 percent of the bid to FLJV.  FLJV will reimburse the bond premium at actual cost not to exceed 2%.

Flatiron – Lane, a Joint Venture

1400 Talbot Road, Suite 500, Renton, WA  98055

Phone (425) 420-9900 / FAX (425) 420-9999

Point of Contact: Rachel Gehrlein, Estimating Administrator (WABids@flatironcorp.com)

 

We Are An Equal Opportunity Employer

Closing Date: 
Tuesday, July 23, 2019