Lindbergh High School Field Improvements
Ohno Construction invites your firm to submit a bid for the following project:
Lindbergh High School Field Improvements
Renton School District
Project Description:
Work to be performed includes exterior improvements to the existing softball and baseball fields, but not limited to, replacing existing grass fields with synthetic turf, new field lighting, dugout replacements, fencing, concrete sidewalks and stairs, railings, scoreboard, stormwater, and site utilities/infrastructure.
Alternate #1: Provide all materials and labor as required to install scoreboards, including support structures, footings, and utilities
Engineers Estimate: $6,000,000.00
Location: 16426 128th Ave SE, Renton, WA 98057
RFI: Send questions to estimating@ohnoconstruction.com by Wednesday, April 30 @ 2:00pm
- This project is subjected to Prevailing Wage
- Subcontractors who are SBE & DBE are encouraged to bid
Schedule:
Anticipated Notice of Award |
On or about May 15, 2025 |
Anticipated Notice to Proceed |
May 23, 2025, Subject to receipt acceptance of COI and Bonds |
Substantial Completion |
October 24, 2025 |
BID DUE DATE & TIME: Wednesday May 7th, 2025 @ 10:00 AM **
Proposals may be emailed to estimating@ohnoconstruction.com or faxed to 206-324-8063. Quotes are required at least 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered.
**Actual bid date is Thursday, May 8th @ 10am. We are requesting bids be submitted a day earlier to ask questions and data entry.
BID DOCUMENTS:
Bid documents are available for download from our website: www.ohnoconstruction.com. Please note to manually type in the email and password. Copy & paste doesn't always work.
https://ohno.sharefile.com/home/shared/fob67c98-08db-40d3-9527-f3a49424fab7
Enter Email: ohnocc.wa@gmail.com
Enter Password: Yosh1966!
Bid documents are provided for your reference only. Ohno makes its best attempt to provide subcontractors with the most complete and current project information for bidding purposes. However, Ohno is not responsible for the accuracy of the supplied bid documents. All takeoff quantities provided by Ohno are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote. Please contact the Estimating Department for any questions.
STANDARD REQUIREMENTS:
By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. Any and all bids may be rejected at the sole discretion of Ohno Construction. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2 percent. The surety must be a Washington admitted surety. Insurance must name Ohno, the project Owner and any other parties so designated as additionally insured and be in the types and amounts required by the specifications. Please contact our office if you need assistance.
Thanks,
Devon Sease
Estimating
Ohno Construction Co. | Ohno-Touchdown JV
P: 206-325-1529 WA
P: 619-278-8824 CA