Link Transit Bus Garage
This contract provides for construction of a new bus garage for electrical vehicle charging at Link Transit's Operations center in Wenatchee, WA. It includes installing pre-engineered building construction, electrical infrastructure, concrete paving, asphalt paving, curbing, sidewalks, watermain, stormwater system, sewer system modifications, illumination, striping, signing and other work as described in the contract documents and Plans.
Note: This is a Prevailing Wage project.
Bid Date: 7/10/2024 1:00 p.m. Base Bid, 2:00 p.m. Alternates
Closing Date:
Wednesday, July 10, 2024
Organization:
Absher Construction Company
Point of Contact:
Jeremy Ackerman, Jeremy.Ackerman@Absherco.com