Louis Thompson Road Tightline
The work in this contract includes installation of a new stormwater system (pipes, structures) and stormwater facilities, walls, driveway regrading, restoration, water line relocation (Schedule B), concrete sidewalk, curb ramps, asphalt pavement, and traffic control. Additional work includes modifying pedestrian push buttons, roadway striping and adjusting utilities in the curb and sidewalk and other work.
Closing Date:
Tuesday, June 25, 2024
Organization:
City of Sammamish
Point of Contact:
jireland@sammamish.us