You are here

Home » Marina Fuel Tanks Replacement - Port of Everett

Marina Fuel Tanks Replacement - Port of Everett

Public notice is hereby given that the PORT of Everett has issued a Request for Bids for the above-named project, with sealed bids due no later than the date and time given above.
This project will demolish existing fuel tanks and install two new 30,000-gallon underground fuel tanks in the Port of Everett’s Central Marina. The project includes, preload, excavation, trenching, furnishing, and installing two new underground fuel tanks, backfill and compaction, fuel piping, electrical as well as demolition, decommissioning, and disposal of the existing fuel tanks and vault all for a complete and operable system.

This project is being funded by a Department of Defense (DOD) Office of Local Defense Community Cooperation (OLDCC) grant which requires construction to start in August 2022. Bidder must be able to start construction by that date.

Complete details of the specification, plans, and all submittal requirements are available on-line at https://portofeverett.bonfirehub.com. Contractors will need to register with Bonfire (free of charge) to download the documents. All bids must be submitted using the Bonfire platform.

Closing Date: 
Thursday, June 30, 2022
Organization: 
Port of Everett
Point of Contact: 
ashleyb@portofeverett.com