You are here

Home » Marshall Road Transmission Main Phase 2

Marshall Road Transmission Main Phase 2

S&L Underground is requesting sub bids and material quotes from all qualified subcontractors and suppliers including MBE, WBE, SBE, and DBE for the following:

City of Spokane - Marshall Road Transmission Main Phase 2

Bid Date: December 11, 2023

Bid time: 1:00 pm

Plans are available at: cityofspokanepublicplans.com

Project description:

This project consists of the construction of approximately 3,600 linear feet of 30-inch diameter water transmission main, 90 linear feet of 48” steel casing pipe with both open cut and trenchless installation, shoring, HMA pavement repair, curb, sidewalk and driveway removal and replacement, sundry utility adjustments, and other related
miscellaneous items.

Areas of work: Traffic control, survey, concrete, aggregate, signage, fencing, piping and appurtenaces and manholes.

Please verify your intent to provide a quotation to admin@slunder.com and respond by 12/7/2023 with your proposals.

Thank you for your time and consideration.

Closing Date: 
Monday, December 11, 2023
Organization: 
S&L Underground, Inc.
Point of Contact: 
Shem Johnson