Mt. Solo Reservoir Fill Line

This project provides for the construction of approximately 750 linear feet of 26-inch diameter, HDPE, SDR9, water main via horizontal directional drilling, approximately 80 linear feet of 26-inch diameter SDR9, HDPE water main via open trench, and approximately 100 linear feet of 20-inch diameter restrained joint ductile iron water main via open trench from the south end of Roy Morse Park to Ridgecrest Dr, in Longview, Washington. The project includes surveying, clearing & grubbing, earthwork, rock placement, erosion control, site restoration, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.        **Liquidated damages per specification 1-08.9**    **Apprenticeship utilization goal of 15% per specification 1-07.9(3)**

Closing Date: 
Wednesday, July 30, 2025
Organization: 
City of Longview