Park Avenue N Extension Project
Construct the Park Avenue N Extension project. The work includes but is not limited to: excavation; grading; sawcutting; removal of pavement; removal of concrete curb, gutter and sidewalk; water main installation; storm drainage installation; illumination system installation; traffic signal system installation; forming and placement of concrete curb, gutter, sidewalk and ADA curb ramps; paving with asphalt; paving with cement concrete; adjustments to utility frames, grates and covers; installation of street channelization; property restoration and all other work necessary to complete the Work as specified and shown in the Contract Provisions.
Full Project Details: https://www.rentonwa.gov/cms/one.aspx?pageId=11092551