You are here

Home » Pataha FTTH Project for the Port of Garfield

Pataha FTTH Project for the Port of Garfield

PORT OF GARFIELD INVITATION FOR BIDS

Project:    22-001-GARFIB – Pataha FTTH Project
Bid Date:    8/4/2022
Bid Due Date:    9/1/2022 by 4:00 P.M. PST

Bids for Pataha FTTH Project for the Port of Garfield will be received at received in person at 141 West High Drive, Pomeroy, Washington, 99347 (Port Administrative Building) or by mail at PO Box 788, Pomeroy, WA 99347 until 4:00 p.m. (PST), September 1, 2022. Bids received after this time will not be accepted. Bids will only be accepted via mail or delivered to the Port Administrative Building. Email or facsimile bids will not be accepted.

The work on this project includes, but is not limited to the following:
•    Furnishing all labor, equipment and materials (unless otherwise noted) necessary for the construction of fiber optic extensions in Pomeroy and fiber-to-the-home (FTTH) construction in Pataha
•    Completing and complying with all permitting as required
•    Completing all make-ready work as noted in the bid documents
•    Known utility owners include: NoaNet, City of Pomeroy Public Works, Garfield County Public Works, Pacific Power & Light, Lumen and the Port of Garfield. The contractor is responsible for confirming all utility owners and locate procedures.

Please refer to the link below for access to the following documents made part of this invitation to bid:

https://drive.google.com/drive/folders/1q2YdjXVHgYfU3N4HE5VobNd4Tna5Z1eG...


Invitation to bid additional documents:
•    01 Pataha FTTH Design
•    02 Pomeroy Fiber Extensions Design
•    03 Bid Sheet
•    04 Owner Provided Materials
•    05 Distribution Construction Standards -PacifiCorp
•    06 WSDOT Permit
•    07 Port of Garfield FTTH General Construction Requirements
•    08 Q&A
 

Closing Date: 
Thursday, September 1, 2022
Organization: 
Port of Garfield
Point of Contact: 
druchert@portofgarfield.com