You are here

Home » Port Gardner Storage Facility

Port Gardner Storage Facility

 

Request for Qualified/Certified MBE/WBE Participation from

Subcontractors/Suppliers/Service Providers

 

Port Gardner Storage Facility - City of Everett Contract WO# UP-3525 

Engineers Estimate $103,790,000

Bid Date: July 1st, 2025 @ 2:00 PM

 

*This is an Electronic Bid Submittal*

*Quotes not received by 10:00 AM on bid day may not be reviewed/evaluated*

 

****Flatiron Dragados Constructors Inc. IS BIDDING THIS PROJECT AS A PRIME BIDDER**** we are requesting M/WBE subcontractor/supplier participation for the following Items of work, but not limited to:

Traffic Control, Erosion Control (Temp & Perm), Minor Concrete, Abandon Well, Welding, Aggregates, Ready Mix, Concrete Pumping Services, Trucking & HazMat Trucking, SWPPP Plan & Materials, Lead Compliance Plan, Geotextile Materials, Underground Precast, Street Sweeping, Sheet Pile Installation, Mechanical Equipment (Furnish and Install,) Vibration Monitoring, Asbestos Monitoring (Abatement), Surveying, QC Testing, Signage, Shoring/Excavation, Demolition, Contaminated Materials Handling, Grouting, Precast Vaults, Concrete Reinforcing, Concrete Formwork, Structural Steel Framing, Steel Roof Decking, Cold Formed Metal Framing, Metal Fabrications & Stairs, Aluminum & Steel Railings, Metal Gratings, Sheathing, Plastic Laminate Faced Cabinets, Plastic Paneling, Fiberglass Reinforced Products & Fabrications including Utility Pipe, Waterproofing, Thermal Insulation, Non-bituminous Self-Adhering Sheet Air Barriers, Metal Roof Panels, PVC Roofing, Sheet Metal Flashing & Trim, Snow Guards, Metal Soffit Panels, Joint Sealants, Hollow Metal Doors & Frames, Access Doors & Frames, Floor Access Doors, Overhead Coiling Doors, Door Hardware, Windows, Glazing, Fixed Louvers, Plastering, Gypsum Board, Ceramic Tiling, Acoustical Panel Ceilings, Resilient Base & Tile Flooring, Painting & Coating, High Performance Protective Coatings, Toilet & Bath Accessories, Fire Extinguishers, Lockers & Benches, Bird Control Devices, Residential Appliances, Solid Surfacing Countertops, Entrance Floor Mats & Frames, Plumbing, HVAC, Electrical, Dynamic Pile Testing, Site Clearing, Excavation & Fill, Dewatering, Soil Cement Ground Improvements, Concrete-Filled Steel Piles, Drilled Micropiles, Asphalt Paving, Chain Link Fences & Gates, TV Inspection of Pipelines, Manholes & Structures, PVC Gravity Sewer Pipe, Packaged Pump Stations, Stormwater Conveyance & Treatment Equipment, Piping Systems, Fuel Transfer, Odor Control, Building Mechanical Drainage, Hanger & Supports for Process Piping, Stop Plates, Fabricated Slide Gates, Valves, Heat Tracing, Pipe Insulation, Belt Bulk Material Conveyors, Bridge Cranes, Centrifugal FRP Fans, Mist/Grease Eliminators, Surge Tanks, Pollution & Waste Control Equipment, and more!

100% performance/payment bonds will be required for the full amount of the subcontract price. Please contact us for any assistance with this solicitation, including obtaining bonding, insurance, equipment, materials and/or supplies. Provide all scopes/quotes as early as possible to enable estimators to perform a thorough evaluation of all quotes received. Quotes will be broken down into comparable packages as reasonably necessary to facilitate participation. Quotes must be valid for the same duration as specified by the Owner for Contract Award. We are signatory to Operating Engineers, Laborers, Cement Masons, Carpenters and Pile Drivers Unions. Non-signatory subs will be required to sign an agreement for trades covered under our union agreements. We intend to work cooperatively with all firms for all bid items you are licensed and qualified to perform. Bid items can be split to facilitate participation from all certified firms. We will reimburse for bond premium up to 2%. Firms must possess & provide current contractor’s license number & DIR Registration number on the quote. Firms must possess insurance and workers compensation coverage meeting project requirements. Waiver of Subrogation is required. Please contact Flatiron Dragados for any assistance required by your firm. Subcontractors/Suppliers will be required to execute our standard agreements and agree to our standard and general terms & conditions. Copies are available for review on our Box.com ftp site or upon email request. 

To access FREE project documents from our BOX ftp site, please send an email request to WABids@flatironcorp.com You will be provided with a BOX link to view & download plans and specs for FREE from our BOX.com ftp site.

Project documents (Plans and Special Provisions) may also be obtained for free on the City of Everett website. To view and download projects docs for FREE from the City of Everett website, use the following link: Port Gardener Storage Facility - Facility Construction Package, City of Everett, WA #UP-3525. NOTE: Google Chrome has disabled support for FTP links and those links won’t work in that browser. You will need to open this page in a different browser to access some of the links  

 

Send ALL Quotes by email to WABids@flatironcorp.com or to our BID FAX at 425-420-9999.

 

    Flatiron Dragados Constructors, Inc. (An Equal Opportunity Employer)

                                      1400 Talbot Road South, Suite 500 Renton, WA 98055                                    

Phone 425-420-9920   Bid Fax 425-420-9999

Contractor License FLATIDC759D6

Closing Date: 
Tuesday, July 1, 2025
Organization: 
Flatiron Dragados Constructors, Inc.
Point of Contact: 
Tiffany Dycus, wabids@flatironcorp.com