Power Outage Resilience

The work consists of furnishing all material, labor, tools, equipment, and incidentals necessary for construction of the Power Outage Resilience project.  The work consists of, but is not limited to, the following:   

Schedule A – Well 4 Site

1.    Submission of product submittals including shop drawings and other descriptive information in accordance with these specifications.
2.    Furnish and install generator receptacle, manual transfer switch, motor soft start, and associated conduit and site work.
3.    Fabrication and delivery of trailer-mounted auxiliary generator, including subbase fuel tank, to wellsite.
4.    Startup and training services including equipment inspection, startup, and field adjustments.
5.    Equipment operation and maintenance manuals.
6.    Surface restoration and rehabilitation.

Schedule B – Well 5 Site

1.    Submission of product submittals including shop drawings and other descriptive information in accordance with these specifications.
2.    Furnish and install generator receptacle, manual transfer switch, motor soft start, and associated conduit and site work.
3.    Fabrication and delivery of trailer-mounted auxiliary generator, including subbase fuel tank, to wellsite.
4.    Startup and training services including equipment inspection, startup, and field adjustments.
5.    Equipment operation and maintenance manuals.
6.    Surface restoration and rehabilitation.

 

Closing Date: 
Wednesday, December 13, 2023
Organization: 
City of Okanogan
Point of Contact: 
Mr. David Ellis, P.E., Gray & Osborne, Inc., 509-453-4833, dellis@g-o.com