Rental Car Facility (RCF) Quick Turn Around (QTA) Boiler Skid 1&2 Replacement
Category: Major Construction
Bid Due Date: January 8, 2025, 2:00 PM
Pre-Proposal Conference: November 21, 2024, 1:00 PM, Online
Amount: $745K
Goal: WMBE Goal 6%
This project will be delivered using the Building Engineering Systems (BES) process, in accordance with RCW 39.04.290, which replace two self-contained, skid boiler packages with like for like function, providing hot water to the north and south Quick Turn Around (QTA) offices buildings. A degree of weatherization to be added to protect equipment from the weather. The new boiler skid is intended to fit within the existing equipment footprint and reuse the utility connections. More Information