Request for Subcontractor & Supplier Quotes - Port of Morrow - Farm 3 & Farm 4 Winter Storage Lagoons
Delhur Industries, Inc. requests quotes from Subcontractors and Suppliers for a multitude of work disciplines in support of our prime contractor proposal to the Port of Morrow. Disadvantaged Business Enterprises (DBEs) are encouraged to respond and participate.
This RFQ is for the Farm 3 and Farm 4 Winter Storage Lagoons project – Contract No. 21-1-11-C6.
PRIME CONTRACTOR: DELHUR INDUSTRIES, INC.
30607 Oldfield Street
Hermiston, OR 97838
Tel: (541) 567-8693 /Fax: (541) 567-0369
SUB/SUPPLIER QUOTES DUE: Wednesday, June 5th, 2024 - by 5:00PM PDT
SUB/ SUPPLIER QUESTIONS: Contact Estimating Department (541) 567-8693
Email: estimating@delhur.com
BID DATE: May 30, 2024 @ 2:00 pm PDT
PROJECT DURATION: July 2024 – September 2025
SUMMARY OF WORK:
The Work to be performed under these Contract Documents consists of furnishing all labor, materials, and equipment necessary for the construction of Farm 3 & Farm 4 Winter Storage Lagoons as described in the Construction Drawings and Specifications. This work shall include but not be limited to all demolition, earthwork, civil, mechanical, structural, landscaping, andelectrical work as shown in the drawings. Work includes re-routing of existing waterlines; excavation and dam embankment construction; HDPE liner system along with a geotextile fabric and associated anchoring; inlet/outlet piping and connection to existing distribution system; dam embankment leak detection system(s); perimeter security chain link fence complete with gates, cable and post system, meter and valve vaults, concrete equipment pads, pump barge concrete pad, deadman anchor blocks. Contractor shall also install a concrete spillway on Farm 3 lagoon. Contractor shall provide storm water pollution prevention plan. Contractor shall include all electrical improvements, including but not be limited to standby generators, switch gear, lighting, motor control centers, and control panels as indicated in the project drawings and specifications to complete the job. Contractor shall also coordinate with the pump barge supplier to install the pump barge in its final location shown in the drawings, complete all mechanical and electrical connections, and assist with startup and commissioning in coordination with the pump barge supplier.
SUBCONTRACTOR & SUPPLIER WORK SCOPES INCLUDE (BUT NOT LIMITED TO):
- Concrete (Supply, Forming/Finishing, Reinforcing, Cast-In-Place, Precast Structural – Manholes and Vaults, Grouting, and Installation)
- Metal Fabrication (Steel Pipe Handrails, Metal Grating, and Metal Floor Hatches)
- Painting and Protective Coatings (Supply and Installation)
- Plumbing (Supply and Installation)
- Electrical (Supply and Installation)
- Geotextile (Supply and Installation)
- Chain Link Fences and Gates (Supply and Installation)
- Hydroseeding
- Sanitary Utility Sewage Manholes, Frames, and Covers (Supply and Installation)
- Leak Detection System (Supply)
- Surveying
- Material Testing
BID DOCUMENTS:
Copies of the Bid and Contract Documents for the Project may be obtained electronically only. Electronic copies are free of charge and may be obtained by contacting the Owner by email at bids@portofmorrow.com. Bidders must provide contact name, company name, contact information (i.e., mailing address, email address, and phone number) to be placed on the bidder’s list to receive a link to the filesharing site where they may download the Contract Documents, and receive notifications regarding any addenda. Addenda are part of the contract documents. Addenda notifications will be e-mailed by the Owner to the bidders as a courtesy only; it is the responsibility of each bidder to ensure the bidder has received a copy of all addenda that have been issued and posted to the filesharing site.
If you are not able to access the bid documents, please contact our Estimating Department at (541)567-8693.
PREVAILING WAGE & DAVIS BACON:
The Project is a public works project as defined in ORS 279C. Oregon Prevailing Wage Rates and Davis-Bacon Wage Rates will apply for this Project. Bidders shall comply with the requirements of those statutes.
PRE-BID MEETING:
A MANDATORY pre-bid meeting will be held on Tuesday May 21st, 2024 beginning at 1:00 PM at the Owner’s Riverfront Center, 2 E Marine Drive, Boardman, OR 97818. The meeting will include a visit to the Project site where the proposed storage lagoons will be constructed.
Delhur Industries, Inc. is an equal opportunity employer.