RFP: Apple Capital Loop - Component 4 South End/Bike Ped Access Bridges
HCC is requesting quotes from Subcontractors and Suppliers for the following project:
Project/Contract No.: 2201.2
Project Description: Apple Capital Loop - Component 4 South End/Bike Ped Access Bridges
Location: Wenatchee, WA
Owner: City of Wenatchee
Bid Closing Date: 12/12/24, 11 AM
Sub./Supplier Quote Due: 12/11/24
Project Duration: 370 Working Days
Bids to be submitted to: estimating@highmarkcc.com or via fax at (360) 829-5473
Point of Contact: Questions you have for HCC can be emailed to: estimating@highmarkcc.com, or you may call our office at 360-829-5189 and ask for Bill Karle in our Estimating Department.
Project Description: This project includes the construction of bridges, approaches and associated site improvements at two locations, one in Wenatchee over BNSF Railway (West Bridge) and one in East Wenatchee over SR28 (East Bridge). The West Bridge will consist of a concrete ramp to Hale Park and to the existing W.T. Clark Pipeline Bridge. A 116’ prefabricated steel truss over BNSF rail will connect to a concrete helical ramp to South Columbia Street and Bridge Street. A secondary elevated, pier-supported access ramp will spur off the north side of the new west bridge, terminating along the west side of Hale Skatepark. The East Bridge will consist of a pavement and concrete ramp on the Columbia River side of SR28, and two 177’ prefabricated steel trusses over SR 28, landing into the 9th Street Park Plaza. All work shall be completed in accordance with the contract plans, special provisions, and the 2025 WSDOT Standard Specifications.
Subcontractor/Supplier Opportunities Include (but are not limited to): erosion control, clearing & grubbing, earthwork/grading, existing bridge demolition, shaft construction, rebar, storm drainage work, water main work, irrigation work, traffic control, electrical, fencing, HMA paving, HMA planing, striping, material and slurry disposal, vac trucks, bridge erection, concrete pumping, pigmented sealer work, landscaping, surveying, and trucking. As well as the supply of ready-mix concrete, aggregate, prefabricated bridge, erosion control materials, traffic control materials, signs, formwork supplies, utility materials, utility hangers, expansion joint materials, bearing pads, and rebar.
HCC encourages bids from all subcontractors and suppliers including Disadvantaged Business Enterprises (DBE’s), for any item of work, or portion of an item, or combination thereof related to this project.
Bid Documents can be viewed at:
https://www.questcdn.com/cdn/posting/9377969/?path=270,333,317&search_id=