RFP Design/Build Services for Memorial Field Renovation Project
FEDERAL WAY PUBLIC SCHOOLS
REQUEST FOR QUALIFICATION
DESIGN / BUILD SERVICES
FOR
MEMORIAL FIELD RENOVATION PROJECT
Submittal Deadline:
Date: December 2, 2021
Time: 12:00 p.m. PDT (12:00:00)
The Federal Way Public School District No. 210 (District) is requesting qualifications from Design-Build teams for the above project using the Progressive Design-Build alternative construction procurement process authorized under Chapter 39.10 of the RCW.
The Memorial Field Renovation Project is located in Federal Way, Washington. The project will increase spectator capacity replacing two existing grandstands and swap the location of the home and visitor grandstand to better accommodate operations for athletics and other District and community events. The track and field will be resurfaced and updated to current standards and support structures such as bathrooms, concessions, and ticketing will be reorganized and replaced. Site improvements will include landscaping, parking, utility connections and frontage improvement as required by the City of Federal Way. Other improvements include lighting, technology, and security infrastructure as well as interior finishes of the locker rooms and stadium offices located in the existing surplus warehouse at the south entrance of the field.
The District anticipates Schematic Design starting winter 2022 and construction beginning spring of 2023.
Interested firms may obtain detailed information regarding the Request for Proposal by sending an e-mail request to Paula Benz at pbenz@fwps.org with the subject header “MEM D/B RFQ Request”.
If additional assistance is required, please contact:
Paula Benz
Federal Way Public Schools
253-945-5938