RFP: Park Ave. N. Extension Project
Johansen Construction Company (JCC) is requesting quotes from Subcontractors and Suppliers for the following project:
Project Name: Park Ave. N. Extension Project
Owner: City of Renton
Bid Closing Date: 12/13/2022, 1:00 PM
Subcontractor/Supplier Quote Due date: 12/12/2022
Project Duration: 100 Working Days
Bids to be submitted to: estimating@johansencci.com or via fax at (360) 829-5473
Point of Contact: Questions you have for JCC can be emailed to: estimating@johansencci.com, or you may call our office at 360-829-6493 and ask for Andy Smith in our Estimating Department.
Project Description: Construct the Park Avenue N. Extension project. The work includes but is not limited to: excavation; grading; saw-cutting; removal of pavement; removal of concrete curb, gutter and sidewalk; water main installation; storm drainage installation; illumination system installation; traffic signal system installation; forming and placement of concrete curb, gutter, sidewalk and ADA curb ramps; paving with asphalt; paving with cement concrete; adjustments to utility frames, grates and covers; installation of street channelization; property restoration and all other work necessary to complete the Work as specified and shown int eh Contract Provisions.
Subcontractor/Supplier Opportunities Include (but are not limited to): clearing & grubbing, erosion control, HMA paving, planing, flatwork concrete, striping, landscaping, hauling, signage, guardrails, traffic barriers, dewatering, electrical, traffic control, structural earth walls, and survey. As well as the supply of ready-mix concrete, pipe/utilities, aggregate, and disposal.
JCC encourages bids from all subcontractors and suppliers including Disadvantaged Business Enterprises (UDBE’s), for any item of work, or portion of an item, or combination thereof related to this project.
Bid Documents can be viewed at:
http://bxwa.com/bxwa_toc/pub/299/ren49_park_ave_n_extension_pro_58875/info.php