Skanska - Highline School District - Pacific Middle School Replacement

MACC 2 Bid Packages: 

Join the project here: https://app.buildingconnected.com/public/5430e7ad5cdc2e0300dd7c53/projec...
 
BP 04A - MASONRY 
BP 07F - METAL WALL PANELS 
BP 09A - FRAMING AND DRYWALL 
BP 06B - MILLWORK AND FINISHED CARPENTRY 
BP 09G - PAINT AND WALL COVERINGS 
BP 32C - LANDSCAPING 
BP 11A - FOOD SERVICE EQUIPMENT 
BP 21A - FIRE PROTECTION 
BP 23L - HVAC & PLUMBING 
BP 26B - ELECTRICAL 
BP 09B - FLOORING (RESILIENT) 
BP 09C - FLOORING (CARPET) 
BP 09D - TILE FINISHES 
BP 09E - ACOUSTIC & SPECIALTY CLNGS 
BP 03A - STRUCTURES  
BP 08A - INTERIOR OPENINGS 
BP 10Z - MISC. SPECIALTIES & CARPENTRY 
BP 31C - SITE IMPROVEMENTS 
 
Sealed bids will be received by Skanska U.S.A. Building, Inc. for construction subcontracts to the GC/CM Contract 
between Skanska U.S.A. Building, Inc. and Highline School District for the above listed Scopes of Work. Deliver 
sealed bids to: 
 
Highline Public Schools – Capital Planning and Construction Building A  
17810 8
th Avenue South 
Burien, WA 98148 
Attention:  David Carver – Senior Project Manager / Skanska USA Building 
 
Bid Dates and Times are as stated below: 
  
BID PACKAGES DUE DATES      
BP 04A – MASONRY – Due no later than 8:00 AM on 6/03/25 
BP 07F - METAL WALL PANELS – Due no later than 8:00 AM on 6/03/25 
BP 09A - FRAMING AND DRYWALL – Due no later than 8:00 AM on 6/03/25 
 
BP 06B - MILLWORK AND FINISHED CARPENTRY – Due no later than 9:00 AM on 6/03/25 
BP 09G - PAINT AND WALL COVERINGS – Due no later than 9:00 AM on 6/03/25 
BP 32C – LANDSCAPING – Due no later than 9:00 AM on 6/03/25 
 
BP 11A - FOOD SERVICE EQUIPMENT – Due no later than 10:00 AM on 6/03/25 
BP 21A - FIRE PROTECTION – Due no later than 10:00 AM on 6/03/25 
BP 23L - HVAC & PLUMBING – Due no later than 10:00 AM on 6/03/25 
BP 26B – ELECTRICAL – Due no later than 10:00 AM on 6/03/25 
 
BP 09B - FLOORING (RESILIENT) – Due no later than 11:00 AM on 6/03/25 

BP 09C - FLOORING (CARPET) – Due no later than 11:00 AM on 6/03/25 
BP 09D - TILE FINISHES – Due no later than 11:00 AM on 6/03/25 
BP 09E - ACOUSTIC & SPECIALTY CLNGS – Due no later than 11:00 AM on 6/03/25 
 
BP 03A - STRUCTURES – Due no later than 12:00 PM on 6/03/25 
BP 08A - INTERIOR OPENINGS – Due no later than 12:00 PM on 6/03/25 
BP 10Z - MISC. SPECIALTIES & CARPENTRY – Due no later than 12:00 PM on 6/03/25 
BP 31C - SITE IMPROVEMENTS – Due no later than 12:00 PM on 6/03/25 
 
Bids will then be publicly opened and read aloud five minutes after the bid due time. Bids received after the dates 
and times stated above WILL NOT receive consideration. 
 
Skanska USA Building Inc. will be bidding on Bid Package BP 03A, 08A, 10Z and 31C. bids to be submitted 
attention Tansy Hansen as defined above.  
 
PRE-BID CONFERENCES  
A non-mandatory, though highly encouraged pre-bid conference will be held on site (Address Below) for MACC 2 
Bid Packages. Pre-Bid Meeting will start at 2:00pm on May 09
th, 2025 inside the existing commons. A job walk will 
take place directly following the pre-bid conference. 
 
Pacific Middle School 
22705 24th Ave S 
Des Moines, WA 98198 
  
Contract Documents for this work may be obtained online through Building Connected available Monday, May 
6
th, 2025; the documents will also be posted online at Builder’s Exchange of Washington (www.bxwa.com) under 
Posted Projects/General Contractor Project areas/Washington/Skanska/Projects Bidding.   
 
Questions that develop during the bid period must be submitted in writing and/or emailed to Skanska USA Building, 
Inc. to david.carver@skanska.com All questions and answers will be published via addenda during the bid period. 
Questions must be received no later than 12:00 PM on May 23
rd, 2025.  DO NOT present questions directly to the 
Architect/Engineer or the School District.   
 
BUSINESS EQUITY: The project is committed to providing an opportunity for participation in contracting local, 
small, and diverse business entities. Highline Public Schools has set a project goal of 10% minority business 
enterprises (MBEs), 6% women business enterprises (WBEs), and 5% public works small business enterprises 
(PWSBE), all state certified with the Office of Minority and Women Business Enterprises (OMWBE) Participation 
may be either on a direct contract basis or as a sub-tier trade partner or supplier.  
 
RETENTION: Skanska plans to obtain a Retention Bond for the project.  Subcontractors will have the option of 
participating in the Skanska retention bond in lieu of having retention held.  Those who do not participate will be 
held to the standard 5% retention. 
 
Skanska USA Building, Inc. reserves the right to reject any or all bids and to waive any non-material informalities or 
irregularities in the bids received.  A bidder may withdraw its proposal by submitting a written request before the 
bid opening time.  Skanska will return the proposal unopened after contract award. 

Closing Date: 
Tuesday, June 3, 2025
Organization: 
Skanska USA Building
Point of Contact: 
david.carver@skanska.com