Skanska - Highline School District - Pacific Middle School Replacement
MACC 2 Bid Packages:
Join the project here: https://app.buildingconnected.com/public/5430e7ad5cdc2e0300dd7c53/projec...
BP 04A - MASONRY
BP 07F - METAL WALL PANELS
BP 09A - FRAMING AND DRYWALL
BP 06B - MILLWORK AND FINISHED CARPENTRY
BP 09G - PAINT AND WALL COVERINGS
BP 32C - LANDSCAPING
BP 11A - FOOD SERVICE EQUIPMENT
BP 21A - FIRE PROTECTION
BP 23L - HVAC & PLUMBING
BP 26B - ELECTRICAL
BP 09B - FLOORING (RESILIENT)
BP 09C - FLOORING (CARPET)
BP 09D - TILE FINISHES
BP 09E - ACOUSTIC & SPECIALTY CLNGS
BP 03A - STRUCTURES
BP 08A - INTERIOR OPENINGS
BP 10Z - MISC. SPECIALTIES & CARPENTRY
BP 31C - SITE IMPROVEMENTS
Sealed bids will be received by Skanska U.S.A. Building, Inc. for construction subcontracts to the GC/CM Contract
between Skanska U.S.A. Building, Inc. and Highline School District for the above listed Scopes of Work. Deliver
sealed bids to:
Highline Public Schools – Capital Planning and Construction Building A
17810 8
th Avenue South
Burien, WA 98148
Attention: David Carver – Senior Project Manager / Skanska USA Building
Bid Dates and Times are as stated below:
BID PACKAGES DUE DATES
BP 04A – MASONRY – Due no later than 8:00 AM on 6/03/25
BP 07F - METAL WALL PANELS – Due no later than 8:00 AM on 6/03/25
BP 09A - FRAMING AND DRYWALL – Due no later than 8:00 AM on 6/03/25
BP 06B - MILLWORK AND FINISHED CARPENTRY – Due no later than 9:00 AM on 6/03/25
BP 09G - PAINT AND WALL COVERINGS – Due no later than 9:00 AM on 6/03/25
BP 32C – LANDSCAPING – Due no later than 9:00 AM on 6/03/25
BP 11A - FOOD SERVICE EQUIPMENT – Due no later than 10:00 AM on 6/03/25
BP 21A - FIRE PROTECTION – Due no later than 10:00 AM on 6/03/25
BP 23L - HVAC & PLUMBING – Due no later than 10:00 AM on 6/03/25
BP 26B – ELECTRICAL – Due no later than 10:00 AM on 6/03/25
BP 09B - FLOORING (RESILIENT) – Due no later than 11:00 AM on 6/03/25
BP 09C - FLOORING (CARPET) – Due no later than 11:00 AM on 6/03/25
BP 09D - TILE FINISHES – Due no later than 11:00 AM on 6/03/25
BP 09E - ACOUSTIC & SPECIALTY CLNGS – Due no later than 11:00 AM on 6/03/25
BP 03A - STRUCTURES – Due no later than 12:00 PM on 6/03/25
BP 08A - INTERIOR OPENINGS – Due no later than 12:00 PM on 6/03/25
BP 10Z - MISC. SPECIALTIES & CARPENTRY – Due no later than 12:00 PM on 6/03/25
BP 31C - SITE IMPROVEMENTS – Due no later than 12:00 PM on 6/03/25
Bids will then be publicly opened and read aloud five minutes after the bid due time. Bids received after the dates
and times stated above WILL NOT receive consideration.
Skanska USA Building Inc. will be bidding on Bid Package BP 03A, 08A, 10Z and 31C. bids to be submitted
attention Tansy Hansen as defined above.
PRE-BID CONFERENCES
A non-mandatory, though highly encouraged pre-bid conference will be held on site (Address Below) for MACC 2
Bid Packages. Pre-Bid Meeting will start at 2:00pm on May 09
th, 2025 inside the existing commons. A job walk will
take place directly following the pre-bid conference.
Pacific Middle School
22705 24th Ave S
Des Moines, WA 98198
Contract Documents for this work may be obtained online through Building Connected available Monday, May
6
th, 2025; the documents will also be posted online at Builder’s Exchange of Washington (www.bxwa.com) under
Posted Projects/General Contractor Project areas/Washington/Skanska/Projects Bidding.
Questions that develop during the bid period must be submitted in writing and/or emailed to Skanska USA Building,
Inc. to david.carver@skanska.com All questions and answers will be published via addenda during the bid period.
Questions must be received no later than 12:00 PM on May 23
rd, 2025. DO NOT present questions directly to the
Architect/Engineer or the School District.
BUSINESS EQUITY: The project is committed to providing an opportunity for participation in contracting local,
small, and diverse business entities. Highline Public Schools has set a project goal of 10% minority business
enterprises (MBEs), 6% women business enterprises (WBEs), and 5% public works small business enterprises
(PWSBE), all state certified with the Office of Minority and Women Business Enterprises (OMWBE) Participation
may be either on a direct contract basis or as a sub-tier trade partner or supplier.
RETENTION: Skanska plans to obtain a Retention Bond for the project. Subcontractors will have the option of
participating in the Skanska retention bond in lieu of having retention held. Those who do not participate will be
held to the standard 5% retention.
Skanska USA Building, Inc. reserves the right to reject any or all bids and to waive any non-material informalities or
irregularities in the bids received. A bidder may withdraw its proposal by submitting a written request before the
bid opening time. Skanska will return the proposal unopened after contract award.