Invitation to Bid 
Lake Washington School District High School Additions:  
EHS MACC 02 Bid Packages: 
 
BP 04B - MASONRY 
BP 07A - ROOFING AND SHEETMETAL 
BP 07F - METAL WALL PANELS 
BP 08D - EXTERIOR WINDOWS AND STOREFRONT 
BP 09B - FLOORING (RESILIENT) 
BP 09C - FLOORING (CARPET) 
BP 09D - TILE FINISHES 
BP 10Z - MISC. SPECIALTIES & CARPENTRY 
BP 31C - SITE IMPROVEMENTS 
BP 32C - LANDSCAPE AND IRRIGATION 
BP 09E - ACOUSTIC & SPECIALTY CLNGS 
BP 09G - PAINT AND WALL COVERINGS 
BP 09A - FRAMING AND DRYWALL 
BP 06B - MILLWORK AND FINISHED CARPENTRY 
 
 
Sealed bids will be received by Lake Washington School District and Skanska U.S.A. Building, Inc. for construction 
subcontracts to the GC/CM Contract between Skanska U.S.A. Building, Inc. and Lake Washington School District 
for the above listed Scopes of Work.  
 
Deliver sealed bids to: 
 
Lake Washington School District – Support Services Center 
15212 NE 95
th Street  
Redmond, WA 98052 
Attention:  David Carver – Senior Project Manager / Skanska USA Building 
 
Bid Dates and Times are as stated below: 
  
BID PACKAGES DUE DATES       
BP 04B – MASONRY – Due no later than 8:00 AM on 5/28/25 
BP 07A - ROOFING AND SHEETMETAL– Due no later than 8:00 AM on 5/28/25 
BP 07F - METAL WALL PANELS– Due no later than 8:00 AM on 5/28/25 
BP 08D - EXTERIOR WINDOWS AND STOREFRONT– Due no later than 8:00 AM on 5/28/25 
 
BP 09B - FLOORING (RESILIENT) – Due no later than 9:00 AM on 5/28/25 
BP 09C - FLOORING (CARPET) – Due no later than 9:00 AM on 5/28/25 
BP 09D - TILE FINISHES – Due no later than 9:00 AM on 5/28/25 
 
BP 10Z - MISC. SPECIALTIES & CARPENTRY – Due no later than 10:00 AM on 5/28/25 
BP 31C - SITE IMPROVEMENTS – Due no later than 10:00 AM on 5/28/25 
BP 32C - LANDSCAPE AND IRRIGATION – Due no later than 10:00 AM on 5/28/25 
 
BP 09E - ACOUSTIC & SPECIALTY CLNGS – Due no later than 12:00 PM on 5/28/25 
BP 09G - PAINT AND WALL COVERINGS – Due no later than 12:00 PM on 5/28/25 
BP 09A - FRAMING AND DRYWALL – Due no later than 12:00 PM on 5/28/25 

BP 06B - MILLWORK AND FINISHED CARPENTRY – Due no later than 12:00 PM on 5/28/25 
 
Bids will then be publicly opened and read aloud five minutes after the bid due time. Bids received after the dates 
and times stated above WILL NOT receive consideration. 
 
Skanska USA Building Inc. will be bidding on Bid Package BP 10Z and BP 31C. bids to be submitted attention 
Tansy Hansen – Senior Project Manager / Lake Washington School District at the same time and address listed 
above.  
 
PRE-BID CONFERENCES  
A non-mandatory, though highly encouraged pre-bid conference and site walk will be held for EHS MACC 02 Bid 
Packages. Pre-Bid Meeting will begin at 2:30pm (After students are dismissed for the day) on 5/7/25. The meeting 
will begin at the location described below. Please check in at the front office.   
 
Eastlake High School 
400 228th Ave NE 
Sammamish, WA 98074  

https://app.buildingconnected.com/public/5430e7ad5cdc2e0300dd7c53/projec...
 
Contract Documents for this work may be obtained online through Building Connected as well as Builder’s 
Exchange of Washington (www.bxwa.com) under Posted Projects/General Contractor Project 
areas/Washington/Skanska/Projects Bidding. They will be available Monday, April 28th, 2025.  
 
Questions that develop during the bid period must be submitted in writing and or emailed to Skanska USA Building, 
Inc. to david.carver@skanska.com All questions and answers will be published via addenda during the bid period. 
Questions must be received no later than 12:00 PM on May 16
th, 2025.  DO NOT present questions directly to the 
Architect/Engineer or the School District.   
 
BUSINESS EQUITY: The project is committed to providing the maximum practicable opportunity for 
participation in contracting by small business entities and disadvantaged business enterprises. That commitment 
includes maximizing opportunity for state-certified minority business enterprises (MBEs) and women business 
enterprises (WBEs) on public works construction projects (collectively referred to as MWBEs). Participation may be 
either on a direct basis or as a subcontractor or supplier.  
 
RETENTION: Skanska plans to obtain a Retention Bond for the project.  Subcontractors will have the option of 
participating in the Skanska a retention bond in lieu of having retention held.  Those who do not participate will be 
held to the standard 5% retention. 
 
Skanska USA Building, Inc. reserves the right to reject any or all bids and to waive any non-material informalities or 
irregularities in the bids received.  A bidder may withdraw its proposal by submitting a written request before the 
bid opening time.  Skanska will return the proposal unopened after contract award. 

Closing Date: 
Wednesday, May 28, 2025
Organization: 
Skanska USA Building
Point of Contact: 
david.carver@skanska.com